Dual Function High-Speed Burner
Fuel: Hot Dirty Producer Gas,Coke Gas
Gas Pressure: Producer Gas: 1.2-----1.5 Pa
Coke Gas: 5----8 Pa
Air Pressure: ≥ 2000 Pa
It can be applied to the steel rolling heating furnace.(Width of Furnace>8m).
Fuel: Hot Dirty Producer Gas,Coke Gas
Gas Pressure: Producer Gas: 1.2-----1.5 Pa
Coke Gas: 5----8 Pa
Air Pressure: ≥ 2000 Pa
It can be applied to the steel rolling heating furnace.(Width of Furnace>8m).