Dear Clients!
We offer cooperation in designing, manufacturing, delivery and assembly of cranes, Single-girder Double-girder overhead travelling cranes Underslung cranes Crane modernization Gantry cranes Bridge Cranes and metal constructions for You.
Crane load capacity, t - from 5 to 100 tons
Span, m (L) - to 42 meters
Lifting height, m (H) - 6; 9; 12; 15; 18; 24; 30; 36; 50 meters
Speed, m/min:
- load lifting - from 1 to 30
- hoist travel - from 20 to 60
- crane travel - from 40 to 120
Crane work load group according to ISO 4301/1 - A2…A7
Mechanism work load group according to ISO 4301/1 - M3…M7
Grappling device - hook, traverse, electromagnet, grapple and other
Crane control - radio control, suspended remote
Drive control system - frequency, transmitter, mixed
Climate production - U1, U2, U3
Power line - sliding, cable
Operational temperature range °C - from -40 to +40
Double-girder design of our cranes allows to:
increase the load capacity while reducing the weight of a crane
increase the efficiency by increasing the speed of moving the load, trolley, crane
Fluid, stepless speed control and precision of load positioning is achieved by the use of frequency converters in the control system.
With the use of top quality components and the highest qualifications of our specialists we ensure minimal variations from dimensions even with the biggest lengths, therefore our cranes have excellent operational parameters.
Increased height of lifting loads, the extreme point of lifting the hook is placed between the bearing girders.
We offer cooperation in designing, manufacturing, delivery and assembly of cranes, Single-girder Double-girder overhead travelling cranes Underslung cranes Crane modernization Gantry cranes Bridge Cranes and metal constructions for You.
Crane load capacity, t - from 5 to 100 tons
Span, m (L) - to 42 meters
Lifting height, m (H) - 6; 9; 12; 15; 18; 24; 30; 36; 50 meters
Speed, m/min:
- load lifting - from 1 to 30
- hoist travel - from 20 to 60
- crane travel - from 40 to 120
Crane work load group according to ISO 4301/1 - A2…A7
Mechanism work load group according to ISO 4301/1 - M3…M7
Grappling device - hook, traverse, electromagnet, grapple and other
Crane control - radio control, suspended remote
Drive control system - frequency, transmitter, mixed
Climate production - U1, U2, U3
Power line - sliding, cable
Operational temperature range °C - from -40 to +40
Double-girder design of our cranes allows to:
increase the load capacity while reducing the weight of a crane
increase the efficiency by increasing the speed of moving the load, trolley, crane
Fluid, stepless speed control and precision of load positioning is achieved by the use of frequency converters in the control system.
With the use of top quality components and the highest qualifications of our specialists we ensure minimal variations from dimensions even with the biggest lengths, therefore our cranes have excellent operational parameters.
Increased height of lifting loads, the extreme point of lifting the hook is placed between the bearing girders.