Swimming Pool
1.Good wind resistance, snow resistance, earthquake resistance, high rigidity, and high structural safety.
2.Large span, 20 to 70 meters span can be easily realized.
3.the degree of factorization is high, 80% of the workload is factorized, in line with the characteristics of national prefabricated buildings.
4.Convenient installation, as long as the crane is used.
5.Short construction period, 500~1000 square meters can be installed in one day.
6.Can implement various spatial three-dimensional modeling.
APplication Area
1.Basketball court space frame
2.Badminton court space frame
3.Volleyball court space frame
4.Indoor football field space frame
5.Bullring space frame
6.Swimming pool space frame
7.Arena space frame
8.Gymnasium space frame
9.
10.Exhibition hall space frame
Solution
the roof of the swimming pool requires a large span and a large space. at the same time, the structure is also required to have good wind resistance, snow resistance, and seismic performance, as well as higher safety performance requirements. the space frame structure meets this feature. Therefore, in the swimming pool we built The space frame structure accounts for more than 80% of the total number.
1.the structure has multiple times of statically indeterminate characteristics, good internal force automatic distribution and adjustment, and it is currently the safest type of all structural systems. the performance of wind, snow, and earthquake resistance is very good.
2.Various shapes can be realized, beautiful and generous
3.the structure can achieve a large span, and professional software can be used to optimize and safely arrange the column points
4.It can be designed according to the safety of 50 and 100 years of use. Once completed, reliable corrosion protection can minimize maintenance workload.
5.for the structure, only bolts are needed on-site to shorten the construction period as much as possible, and the installation quality is high, and the safety hazards are minimized.
6.the overall cost is low, cost-effective, and the total cost and the total cost of the trial period is very well controlled.
China, the structure is used in schools and public buildings. after an earthquake or natural disaster occurs, it is used to house victims. after the design safety level is reached, the structure will not be damaged by earthquakes or strong winds. It is strong and safe.
for large-area membrane roofs, on-site welded pipe trusses are recommended.
Process Description
1.Design process:
(1)the swimming pool hall adopts the space frame structure. It is recommended that the structural importance coefficient must be amplified according to the use requirements and the natural disasters that may be encountered in the area. Even if there is no requirement, it should be enlarged to at least 1.15 to 1.2 (standard requirements, but also Other considerations).
(2)Consider more possible combinations in load combinations, and load combinations with less impact should also be considered;
(3)Pay attention to the loads such as hanging lamps on the lower string, overhauling horse tracks, and ceilings, and also taking into account the concentrated hanging loads that may appear in possible places in the future.
(4)the calculation strength of the components should be considered more conservative and safer, and any possible hidden dangers must be considered and enlarged. It cannot be ignored because of the uncertainty of the economy or safety risks.
(5)Anti-wind, anti-snow, anti-seismic, and other extreme weather should be pre-judged. Ensure the safety of the natatorium space frame from the design source!
2.Production process:
All-round factory quality control of materials, processing, and welding must be carried out to ensure the quality of the components. after the material self-inspection, it must be re-inspected by a third party for processing. the processed materials need to be tested the indoor destructive test is conducted to ensure that the quality of the components is excellent before leaving the factory.
3.Installation process:
the quality of installation is related to the safety of later use. for large stadiums, we will recommend the installation by skilled Chinese workers. during the installation, skilled workers must be directed by experienced on-site technicians to install. It is not recommended that local workers undertake the main task of installation, except for non-important parts such as roofing. after installation, we will check to eliminate possible hidden dangers and ensure safety before use.
Standard: | AISI, ASTM, BS, DIN, GB, JIS |
Grade: | Light Steel |
Place of Origin: | Jiangsu, China |
Brand Name: | SAFS |
Model Number: | GS001 |
Type: | Light |
Application: | Structural Roofing |
Tolerance: | ±5% |
Processing Service: | Bending, Welding, Decoiling, Cutting, Punching |
Product Name: | Prefabricated Steel Structure Swimming Pool Roof |
Surface Treatment: | Hot Dip Galvanized |
Steel Material: | Q235B/Q355B, 45#, 40Cr |
Design Standard: | AISI,ASTM,BS,DIN,GB,JIS |
Application Fields: | Student Gym Building |
Roof Cover: | Steel Panel / FRP Panel/Customized |
Processing: | Bending, Welding, Decoiling, Cutting, Punching |
Life span: | 50 Yeas |
Size: | Costomers' Requirements |
Certificate: | SGS ISO CE etc. |