High performance: RGM grouting materials are of the second generation product; the secondary grouting for equipment installation ensures no crack occurred.
 
 
 Early high strength: The strength after one day is up to over 50MPa, and operation and production is available only one day after accomplishment of the equipment installation.
 Fluid-state: The grouting material can be directly poured in the equipment foundation after extended with water and mixed on site, to fill all cracks of the foundation without need for vibrating. 
 Micro expansion: It ensures close contact between equipment and foundation.
 Anti oil-seepage: 30 days after soaked in engine oil, the strength will increase by above 10% than that of before soaking.
 Heat resistance: The primary grouting for equipment or ground is available under the normal temperature or high temperature environment less than 600℃.
Durability: No obvious change occurring in the strength after two million times of fatigue tests and fifty freezing-thawing cycle tests.
 
Application instructions
 Reinforcement projects of equipment installation and industrial and civil buildings such as beam, floor, column and wall in Dingzhou Power Plant, Tangshan Power Plant, Xi'an Aircraft Industry (Group) Company Limited, Beijing Satellite Manufactory, Beijing CBD Project, Xinxing Pipes, Guizhou Gold Ore Metallurgical, Beijing, Tianjin, Xi'an, and Taiyuan, etc.
 
  Construction is carried out with reference to relevant regulations in the “Technical Specification for Construction of Cement-based Grouting Material” (YB/T9261-98).
 
 Construction is carried out with reference to relevant regulations in the “Specification for Construction and Acceptance of Concrete Structures” (GB50204).
 
 During construction, only water is extended in grouting material and mixed evenly by hand mixing for 3~5 minutes and 2 minutes by mechanical mixing. No other material is permitted to extend. Refer to the water consumption recommended in the “Quality Certificate".
  
 
Main Applications
 
 For the primary grouting and the secondary grouting during installation of large equipment .
 
 For burying steel bars and anchoring building anchor rods.
 
 For reconstruction and expansion reinforcement projects of the construction engineering, and reinforcement of the joints of beams and columns, and the crane beam.
 
 Anchoring construction of railway sleepers.
 
Project Application
 Tianjin Iron & Steel Co., Ltd., Tianjin Steel Rolled Co., Ltd., Laiyuan Steel Mill, Tangshan Iron and Steel Co., Ltd. and Shijiazhuang Iron & Steel Co., Ltd.