| Specification | Model | ZY210 |
| Operating Weight | 20000kg | |
| Engine Power | 115kw/2000r.p.m | |
| Standard Bucket Capacity | 0.8-1m3 | |
| Maximum Digging Depth | 6643mm | |
| Maximum Digging Height | 9631mm | |
| Maximum Dumping Height | 6864mm | |
| Maximum Digging Radius | 9925mm | |
| Front Minimum Swing Radius | 3554mm | |
| Platform Width | 2622mm | |
| Undercarriage Width | 2800mm | |
| Track Shoe Length | 4148mm | |
| Transportation Length | 9472mm | |
| Transportation Width | 2800mm | |
| Transportation Height | 2869mm | |
| Clearance Under Counterweight | 1053mm | |
| Minimum Ground Clearance | 492mm | |
| Hydraulic System Working Pressure | 30 | |
| Variable Pump Displacement | 2X107 | |
| Maximum Digging Force of Bucket | 122.85KN | |
| Maximum Digging Force of Arm | 97.64KN | |
| Grade Ability | 35KN | |
| Ground Contact Pressure | 0.48 | |
| Travel Speed | 4.88/3.42 | |
| Maximum Drawbar Pull | 19t | |
| Swing Speed of Frame | 11 | |

