| Technical Specification |
|
|
|
|
| Power |
22 kw |
|
|
|
|
| Overall Size |
2200×1600×4150mm |
|
|
|
|
| Vibration Frequency |
Max. 1400r/m |
|
|
|
|
| Electrical source |
380V/50Hz |
|
|
|
|
| Total Mass |
3000kg |
|
|
|
|
| |
|
|
|
|
| Intrduction of SY1000 pipe making machine |
|
|
|
|
| SY Series Tube Machines are ideal equipment for |
|
|
|
|
| Producing concrete tubes, now. It is reasonable in design, |
|
|
|
|
| Beautiful in appearance, reliable in performance and |
|
|
|
|
| Convenient in operating. Its quality is up to State |
|
|
|
|
| Standards of GB11836-89. With this series of machines, |
|
|
|
|
| The concrete tubes with specifications of 200 -1000mm |
|
|
|
|
| Can be produced by using pulverized coal ash, slag, sands |
|
|
|
|
| And crushed stone pulsing little quantity of cement. |
|
|
|
|
| The tubes produced with this series machines are even in |
|
|
|
|
| Their wall thickness, smooth on surface, high in compression strength, convenient and firm in connection, |
|
| And excellent in anti-seeping, which are widely used in agricultural irrigation and draining projects in |
|
| Cities. |
|
| Specifications:200 - 1000mm |
|
| Detailed Product Description |
|
| The capital construction uses fastener |
|
| This product is one new kind of fastening units for construction moulding plates, which are used for |
|
| Fastening the construction moulds for concrete placement at work sites. While using, only need to operate |
|
| The fastening part on it. This product consists of clamping bracket (fixing head) and sliding bar. During |
|
| Using, it depends on the extending force, which is produced by moulding plate to flate noses of the |
|
| Fastening unites, and the shearing force, which is produced between the clamping bracket and through hole, |
|
| To fixed to each other. Basic Performance: To produce shearing force for fixing to each other. Function |
|
| And Purpose: Simple in operation; Economic in working labor and time; Recycle; No harm to wooden mould |
|
| Plates. They are suitable for fixing any frame structures, and the moulds for columns and beams in the |
|
| Earlier construction period of bridge building. Very cheap and practicality |
|