Stage 1. raw material batching         Manual
-handle trolly                      (2 sets), Carry sand, scree, cement etc. to mixer
 
Stage 2. concrete mixing              Mechanical
-concrete mixer                       Prepare concrete for block making machine
 
Stage 3. block making                     Auto
-concrete belt conveyer              Carry concrete to storage hopper
-concrete storage hopper                         Store concrete for block making machine
-PX-QT/M block making machine            Produce concrete blocks
-hydraulic station                                         provide strong oil pressure power for actions of block making machine
-pallet feeder                                                Provide pallet to block making machine
-block conveyer                                           Carry fresh blocks&pallet out from block making machine
 
Stage 4. block curing      Manual
-wheel trolly                                                  (about 3 sets) Carry blocks&pallet to curing area, then to block storage area
 
Stage 5. block cubing           Manual
 
Stage 6. pallet returning         Manual
 
Control System                    1 PLC
It control the working condition of concrete belt conveyor, concrete storage hopper, hydraulic station, block making machine, block conveyer, movable stacker, and pallet feeder.
 
Curing Way                    Natural Curing I
2 days at curing area, be kept moist by sprinkling with water, then be moved outside to block storage area for at least 25 days before selling
 
Workers Needed                  12
2 for aggregates batching and put aggregates into hoisting hopper of mixer; 1 for mixer, water adding in, concrete discharging; 1 for block making, operating the control cabinet; 4 for moving block&pallets to trollies and bringing them to curing area; 3 for moving cured blocks to blockstorage area, cubing blocks and collecting pallets there; 1 for carrying pallets to block making machine.
 
Accessories
-bamboo pallets                         (about 1600 pcs) for blocks to be produced on until be cubed away after be cured.
 
Comparing with other production lines, this production line needs the lowest equipment investment, with machines bought from our company, customer can produce blocks and doesn’t need to prepare any other equipments. The installation, commission and personnel training needs about 2 weeks.