Stage 1. raw material batching Manual
-handle trolly (2 sets), Carry sand, scree, cement etc. to mixer
Stage 2. concrete mixing Mechanical
-concrete mixer Prepare concrete for block making machine
Stage 3. block making Auto
-concrete belt conveyer Carry concrete to storage hopper
-concrete storage hopper Store concrete for block making machine
-PX-QT/M block making machine Produce concrete blocks
-hydraulic station provide strong oil pressure power for actions of block making machine
-pallet feeder Provide pallet to block making machine
-block conveyer Carry fresh blocks&pallet out from block making machine
Stage 4. block curing Manual
-wheel trolly (about 3 sets) Carry blocks&pallet to curing area, then to block storage area
Stage 5. block cubing Manual
Stage 6. pallet returning Manual
Control System 1 PLC
It control the working condition of concrete belt conveyor, concrete storage hopper, hydraulic station, block making machine, block conveyer, movable stacker, and pallet feeder.
Curing Way Natural Curing I
2 days at curing area, be kept moist by sprinkling with water, then be moved outside to block storage area for at least 25 days before selling
Workers Needed 12
2 for aggregates batching and put aggregates into hoisting hopper of mixer; 1 for mixer, water adding in, concrete discharging; 1 for block making, operating the control cabinet; 4 for moving block&pallets to trollies and bringing them to curing area; 3 for moving cured blocks to blockstorage area, cubing blocks and collecting pallets there; 1 for carrying pallets to block making machine.
Accessories
-bamboo pallets (about 1600 pcs) for blocks to be produced on until be cubed away after be cured.
Comparing with other production lines, this production line needs the lowest equipment investment, with machines bought from our company, customer can produce blocks and doesn’t need to prepare any other equipments. The installation, commission and personnel training needs about 2 weeks.

