· Make full use of the old materials on the spot, which saves resources and protects the environment.
· The construction period is shortened by half, and the construction cost is reduced by over 1/3.
· The weather conditions will not hinder much, stop the work when it rains and resume working immediately when it is fine.
· The machine works at high speed, and it can reinforce the road bed and improve the road grade.
· Notably reduced the influence to the public traffic, the traffic can be normal on the other side of the road during half side operation.
Model |
WB525 | |
Engine |
Type |
KTA19-C525 |
Rated Power |
392kw | |
Mix Width |
2440mm | |
Mix Depth |
O-400mm | |
Operating Speed |
0-15m/min | |
Travel Speed |
0-12km/h | |
Machine Weight |
30000kg | |
Drive Mode |
4WD | |
Size (L×W×H) |
9873×3184×3530 |
Mainly applicable in the upgrade of county road