Product Main

Specifications

Name NPT
Size 38*24*3600*0.3mm
Lead Time 15 days/20'FCL
MinOrder 1*20"FCL
Package pieces in cartons and cartons in 20'FCL

 

 

LOADING QUANTITY

Type: NPT 38 A1
Main Tee: 30PCS/CTN, total 4950PCS / 165CTNS / 1*20’FCL
Long Cross Tee: 60PCS/CTN, total 29700PCS / 495CTNS / 1*20’FCL
Short Cross Tee: 75PCS/CTN, total 29700PCS / 396CTNS / 1*20’FCL
Wall Angle: 50PCS/CTN, total 4400PCS / 88CTNS / 1*20’FCL
Total: 68750PCS / 22000M2


Type: NPT 32 A1
Main Tee: 30PCS/CTN, total 5400PCS / 180CTNS / 1*20’FCL
Long Cross Tee: 60PCS/CTN, total 32400PCS / 540CTNS / 1*20’FCL
Short Cross Tee: 75PCS/CTN, total 32400PCS / 432CTNS / 1*20’FCL
Wall Angle: 50PCS/CTN, total 4800PCS / 96CTNS / 1*20’FCL
Total: 75000PCS / 24000M2
Installation Instructions
1.According to the design drawing, determine the ceiling height. Mark the desired height at each room corner then make a perimeter chalk line, which should be 20mm above your desired ceiling height.
2.Install hangers and fasteners--snap a chalk line for the main tees, attach hangers and wires.
3.Install main tees—pull each hanger wire through the hanger hole in the tee, bend the wire up and wrap it around itself three times. Then continue to insert all other hanger wires. The intervals of two main tees should be 1220 MM./1200MM.
4.Install cross tees—push cross tee end through the main tee slot until the sound “click”. Fasten the cross tees. The intervals of two cross tees should be 610 MM./600MM.
5.Lay in the ceiling panels—slightly tilt each panel up through the opening and lower it to rest squarely on all four tees..
6.Important notice: lighting and other fixtures must be supported by the grid, not by the ceiling panels