Shandong Jin Liang Construction Machinery Co., Ltd
Main technical parameters
|
item |
SCD200 |
SC200 |
SC100 |
SC110 |
SC200 |
SCD200/200 |
SCD200/200 |
SCD200/200 |
|
Rated load |
2000 |
200 |
1000 |
1100 |
2000 |
2×2000 |
2×2000 |
2×2000 |
|
Height |
50 |
50 |
50 |
50 |
50 |
50 |
50 |
50 |
|
Lifting speed |
33 |
33 |
33 |
33 |
33 |
33 |
0~63 |
0~96 |
|
Motor power |
2×11 |
4×11 |
2×11 |
2×11 |
3×11 |
(2×2) ×11 |
(2×2) ×15 |
(2×2) ×15 |
|
Rated erection
load |
1000 |
200 |
1000 |
1100 |
2000 |
2×1000 |
2×1000 |
2×1000 |
|
Counterweight
mass |
1000 |
0 |
0 |
0 |
0 |
2×1000 |
2×2000 |
2×2000 |
|
Dimension inside |
1.1×1.1×2.2 |
1.1×1.1×2.2 |
2.5×1.3×2.5 |
2.5×1.3×2.5 |
2.5×1.3×2.5 |
3.2×1.5×2.5 |
3.2×1.5×2.5 |
3.2×1.5×2.5 |
|
Item |
SCD200/200 |
SCD200/200 |
SCD200/200 |
SCD200/200 |
UNIT |
|
Rated load |
2×2000 |
2×2000 |
2×2000 |
2×2000 |
kg |
|
Height |
50 |
50 |
50 |
50 |
m |
|
Lifting speed |
0~96 |
0~96 |
33 |
0~63 |
m/min |
|
Motor power |
(2×2) ×15 |
(2×2) ×22 |
(2×2) ×11 |
(2×2) ×15 |
kw |
|
Rated erection
load |
2×1000 |
2×1000 |
2×1000 |
2×1000 |
kg |
|
Counterweight
mass |
2×2000 |
2×2000 |
2×1000 |
2×2000 |
kg |
|
Dimension inside |
3.2×1.5×2.5 |
3.2×1.5×2.5 |
3.2×1.5×2.5 |
3.2×1.5×2.5 |
m |

