Product Main

Specifications

TDC unit is one of the two universal flange making systems in the world. It can save time and material drastically with its wel-seal, strong and durable joint structure. So it is specially suitable for producing a duct with a large sectional area. Today many famous buildings in the world utilize this kind of structure in the ventilation system such as the American Kennedy Space Center, Guangzhou CITIC Plaza etc. The unit consists of a feeding frame, main forming machine and a shearing unit, which includes grinder and hydraulic shearing unit. The hydraulic shearing unit makes fixed cutting available with very little burr, and may be operated automatically with a maximum work speed of 6 m/min. It is divided into four types: T-20,T-30,T-35,T-40 with their corresponding duct corner T-20DC,T-30DC and T-40DC.TDC made by SBKJ may match and produce all the ducts in the DW144 standard, and has passed the HVAC PW/TMI(1987) pressure test, which is a speciality test for the intensity and sealed condition of a duct.
 
Technical date
 
Type
Edge wide
Capacity
Motor
Weight
Dimension
20A
88mm
0.8mm
3kw
2000kg
2800×600×1150mm
30A
120mm
1.0mm
3kw
2200kg
3000×600×1150mm
35A
131mm
1.0mm
3kw
3000kg
3200×600×1200mm
40A
141mm
1.2mm
4kw
3000kg
3200×600×1200mm
 
Type
Edge wide
Capacity
Motor
Weight
Dimension
20B
86.5mm
0.8mm
3kw
2000kg
2800×600×1150mm
30B
118mm
1.0mm
3kw
2200kg
3000×600×1150mm
40B
176mm
1.2mm
4kw
3000kg
3200×600×1200mm
 
Type
Name
Capacity
Size
T-20DC
Duct comer
2.5mm
a=95mm
T-30DC
Duct comer
3mm
a=105mm
T-40DC
Duct comer
3.5mm
a=123mm
LT-30
Duct comer
3mm
a=105mm
T-35DC
Duct comer
3mm
a=106mm
BC-10
Duct clip
5mm
 
 
 
 
Installation
SBKJ TDC angle - flanged joints requires a ordinary circular saw cut for cutting. Cut two lengths of the flanges 30mm shorter than duct overall dimesion. The flanges should be cut in the direction shown to prevent metal cutting damage on the Cut flanges. If any burring has occurred during cutting of the flange, this must be removed before assembly
Insert four corners joints into the end of the flange. Please note. Ensure the corners are fully inserted into the flange. Complete the whole frame by securing the corner.
The frame to the duct, should be fairly tapped when inserting from one side of the frame and then along the full length of the flange.
Fixing the flange into the duct by various methods, spot welding or riveting. Spacing for fastening to be as DW144 Table 5. Maxmium distance from the corners should not exceed 50mm.
When the frame is securely fixed, it is suggested that a duct sealant needs to be applied, on either the inside or outside of the flange and on the corner piece where it meets the duct.
 
Application in duct making
1, Grooving
2, TDF Flange
3, "C”Locking Seam
4, Single and Double
 hem locknection
5, TDC flang                
6, Clip
7, Pittsburgh Lock
Single lock
8, Snap lock
9, Elbow Lock
10,"S" Locking seam
11,TDC corner
12,Corner conneting