The 250-300 TPH Jaw
& Cone Crushing Plant includes vibrating feeder GZD1300X4900, jaw crusher
PE900X1200, cone crusher ZYS51-B,ZYS51-D, vibrating screen 3YZS1860, belt
conveyor and centrally electric controlling system, etc. This designed capacity
is from 50t/h to 500t/h. To meet customer's specific requirement, we can also
add other equipments such as impact crusher, dust catcher on the crushing
plant.
Process of 250-300 TPH
Jaw & Cone Crushing Plant:
Big materials are fed
to the jaw crusher evenly and gradually by vibrating feeder through a hopper
for primary crushing. After first crushing, the material will transferred to
cone crusher by belt conveyor for secondary crush; the crushed materials will
then transferred to vibrating screen for separating. After being separated, the
parts that can meet standard will be taken away as final products, while the
other parts will be returned to impact crusher, thus forming a closed circuit.
Size of final products can be combined and graded according to customer's
specific requirement. We can also equip dust catcher system to protect
environment.