Main Technique Parameters :
Max. Push & Pull Force :300KN
|
Max. Torque :11000N.m
|
Max. Push & Pull Speed: 38m/min
|
Max. Rotary Speed:130r/min
|
Engine Power:132KW
|
Max. Mud Flow :250 L/min
|
Max. Walking Speed of Caterpillar :3Km/h
|
Max. Mud Pressure :8Mpa
|
Max. Diameter of Expanding Aperture: 1000mm(Soil Dependent)
|
Max. Distance of Construction:450m(Soil Dependent)
|
Entry Drill Angle :10~22°
|
Max. Climbable Gradient :18°
|
Company development
May, 2002 Shanghai Goodeng Construction Machinery Manufacturing
CO.,LTD was established.
Sep, 2002 The first hydraulic static piling machine was produced.
Sep, 2004 Pass the certificate of ISO 9001: 2000 quality management
system.
2004 The first horizontal directional drilling machine(GD600-L)
was produced.
Mar, 2005 Join in Shanghai CSTT.
Apr, 2006 Join in ISTT and CSTT in China.
OTC, 2006 The first set of GD1250-L HDD machine and GD2800-L
HDD were successfully produced.
May, 2008 Shanghai Goodeng Industrialization base of China Archit-
ecture R&D Institute Architecture Mechanism Branch was
finished.
May, 2008 Produced the first set GD6000-BL HDD machine, which is
largest one in China and delivery to customs Shengli Oilfield.
Aug, 2009 The largest HDD machine research and produce base—Jian-
gsu Goodeng Engineering Machinery Assembling CO., LTD
(China-Malaysia Joint Venture) has completed in Dafeng,
Jiangsu.
Oct, 2009 The largest HDD drilling machine-GD8000-L was under
producing.