Product Main

Specifications

Product explanation:
These machines are manufactured and designed to meet the high quality requirements and standards, such as GB/T2423.17,JIS Z 2371,ASTM B-117. They are used to test the resistance capabilities of materials eroded by brine, these materials may be used in Electrical Appliances, Electrical wire, Aaccessories, Luminaires etc.
 
Features:
* All accessories are supplied from GERMANY,JAPAN and TAIWAN. High quality accessories.
* All machines are constructed by PP and PVC, they can function perfectly in an acidic and alkaline environment without aging.
* They can perform both Brine and Cupric Acetate tests.
* Patent atomizing nozzle and coniform diffuse devices help to make fog more symmetrical.
* Provide a spray capacity measuring barrel.
* Test period can be preset from 0.01s to 9999h.
* Water can be placed in the test chamber and saturation tower automatically or manually.
* Double over-heating protection systems protect the security of both machine and operator.
* Temperature controller from OMRON(Japan) makes temperature precision reach +-0.1 degree Celsius.
* They can demist automatically to make viewing more convenient after testing.
* The temperature in the chamber can rise quickly. Accelorated by a titanium alloy heater supplied from Taiwan.
* Cover is made from acrylic with a 5mm thickness supplied from Germany.
* They provide lucite rods and shelves to hang or support specimens within the test chamber.
 
Technical parameter:
Chamber capacity: From 108L to 1440L.
Solution reservoir: From 15L to 40L.
Salt spray nozzle: 1pcs or 2pcs.
Operating hours: 72h.
Removable slotted sample rods: 6 rods and 4 shelves.
Cover lift: Depanding on different models.
Saturation tower capacity: 4L.
Construction: Polypropylene or PVC.
Color: Gray.
Temperature range: Up to +80 degree Celsius.
Salt spray fall-out rates: Adjustable from 1.0 to 2.0 ml per 80 cm2 per hour.
Spray pressure: 0.8~2.0kgf/cm (powered by compressed air).
Power supply:1 phase, voltage and frequency dependant on country/region of installation.
Exhaust: Exhaust pipe should be installed outside building.
Drain: Drain pipe should be installed into floor level drain.