Product Main

Specifications

 
Description:
The product is inorganic mixture, fast harden\ High intensity \ micro-expansion, Environment-friendly. do not need to warm up in normal condition (20℃\68℉ \ 70 % Humidity). Mixed with water is available. Avoid crack due to partial warmed, which reduce the working time of rail spike.   Constriction at -10℃\ 14℉ is available. Well performance after 2 million times destructive test 
Applications:
1, It can be used in railway: rail spike anchoring of the concrete railroad crosstie \ crosstie of bridge. It can be used in anchoring of installed bridge bonded joined and the foundation bolt of instrument.
2, It can be used in railway\ tunnel \ channel \ coal mine \  Strengthen of bridge pier \  anti-crack of house \ Metallurgic mine etc. fast construction for anchorage of underground construction with  anchoring component. In order prevent stone drop.
3. It can be used in the Strengthen of the concrete construction with reinforcing steel bar. And satisfy the weld of the reinforcing steel bar.
Specifications:  
Vertical Expansion Rate (%)
Compressive Strength(M pa)
Rail spike pull-out resistance(KN)
4 hours
1 day
3 days
≥ 0.02
>20
>35
>50
>60
Standard : TB/T2093-2002
How to Use
No.
Steps
Tools
Requirements of Construction
Remarks
1
Take out the old rail spike
special tools
1. take out the old spike
2. Cleaning the hole of the rail spike.
It’ s better to wet the hole with water
2
Set the shelf of anchorage
stick
put the shelf of anchorage into the hole
 
3
Mixing
Container\ spoon\ bucket
Mix 14-16% water with the anchoring agent,   mix evenly
Add or reduce water according to  situation 
4
Grouting
spoon
Grouting the mixed anchoring agent into the hole from the middle of the shelf of anchorage. 2cm to the top of the hole it’ s better.
 
5
Put  the rail spike
 
Put the spike after grouting, make sure it’ s vertical.
Make sure no oil stain on the spike
6
clean up
Stick
Remove the overflow material
Grouting again if the hole can not full enough
7
Fix the fastener
T- spanner
After anchoring (60 min), fix the fastener, screw down the nut with hand, after 120 min screw down the nut with T-spanner, 24hour screw down tightly as required   
 
8
Change the new railroad
 
It will be available after 1 day curing.
It’ s better to spray water after 1-3 days curing
Notices:   dosage of each rail spike ± 0.4 kg.  
  Attentions:
1.  The mixed material should be used up within 30 min, mixing time 2-5 min.  
2.   Add or reduce water according to situation to enjoy best flow-ability.
3.   If the temperature at -10-0℃\ 14-32℉, mixing the anchoring agent with 40-50 ℃\104-122℉ water. Cover the necessary insulating-compound in order to prevent frostbite.  
 
 
Package & Storage:
10± 0.5 kg / bucket, 6 months from manufacture date store in dry & cool place \ waterproof \ moisture proof with original package un-opened. Non-toxic \ non-test \ non-fire \ non-explosion.