our mill produce steel tube,seamless steel tube,seamless tube,seamless tubes,hot rolled seamless tube,hot rolled seamless steel tubes,tubes,carbon seamless steel tube,big size seamless steel tube,
API steel tube,ASTM A53 seamless steel tube,ASTM A106 seamless steel tube,
seamless tube,carbon seamless .welcome u and u team come to visit.
1) Specification: ASTM A106/A53/API 5L GR. B
2) Size: From 6" to 48", OD from 168.3 mm to 965mm
3) Wall Thickness From 6 mm to 30 mm
4) Schedule: SCH40, STD, SCH80, XS, SCH160, XXS etc.
5) Length: 5.8 meters for 20' container, 6 meters to 12 meters for 40' container
6) Packing: In bundles, Varnish coating, Ends can be bevelled , End capped
7) Certification: ISO9001.2000, API, Mill Test Certificate EN10204/3.1B
8) Third party inspection: BV, SGS, Lloyds
9) Payment: TT 30% or 100% Irrevocable LC at sight
10) Delivery: FOB / CFR / CIF
11) Supply Ability: 20000MT/month
12) Delivery Lead Time: Within 15 days after the receipt of L/C
API steel tube,ASTM A53 seamless steel tube,ASTM A106 seamless steel tube,
seamless tube,carbon seamless .welcome u and u team come to visit.
1) Specification: ASTM A106/A53/API 5L GR. B
2) Size: From 6" to 48", OD from 168.3 mm to 965mm
3) Wall Thickness From 6 mm to 30 mm
4) Schedule: SCH40, STD, SCH80, XS, SCH160, XXS etc.
5) Length: 5.8 meters for 20' container, 6 meters to 12 meters for 40' container
6) Packing: In bundles, Varnish coating, Ends can be bevelled , End capped
7) Certification: ISO9001.2000, API, Mill Test Certificate EN10204/3.1B
8) Third party inspection: BV, SGS, Lloyds
9) Payment: TT 30% or 100% Irrevocable LC at sight
10) Delivery: FOB / CFR / CIF
11) Supply Ability: 20000MT/month
12) Delivery Lead Time: Within 15 days after the receipt of L/C