used GE MS6551B gas turbine generator main datas
1 Model MS6551B
2 Manufacture Year 1996
3 Running Hours 8031h
1 Model MS6551B
2 Manufacture Year 1996
3 Running Hours 8031h
First Project(simple cycle) start to build on 1995.12.31
No.1 gas turbine start running on 1996.7.23. Check the over heat channel in Apr. 2005.
Changed the first stage stator blades
No.1 gas turbine start running on 1996.10.26. Check the over heat channel in Oct. 2004.
Changed the first stage stator blades
Second project(Combined cycle) start to build on 1997.6.14, and finished on 1998.10.30.
Gas turbine changed to run on natural gas on 2004.12.26.
second hand GE MS6551B combined cycle power plant Main equipment list
1#,2# gas turbine
|
2
|
MS6551B(natural gas/light oil)
|
38.72MW
|
America GE
|
1996
|
1#,2# steam turbine
|
2
|
C15-3.43/0.981-3
|
15MW;50t/h
|
Nanjing Turbine& Electric Machinery Co
|
1998
|
1# Exhaust heat boiler
|
1
|
Q394/539(201)-66(9.5)-3.82/450(0.25)
|
66t/h
|
China ship 703 Institute
|
1998
|
2# Exhaust heat boiler
|
1
|
Q391/542-66(9.5)-3.82(0.25)/450(138)
|
66t/h
|
Hangzhou boiler company
|
1998
|
1#,2# assistant fuel boiler
|
2
|
UG-35/3.82-Y2
|
35t/h
|
Wuxi boiler company
|
1998
|
Gas turbine generator
|
2
|
6A3
|
45400KVA
|
America GE
|
1996
|
second hand GE MS6551B combined cycle power plant contact information
if you are intrested about this machine, pls kindly contact with Ms.Mina