Product Main

Specifications

Product Attributes  
Related attributes of ERW galvanized pipe BS1387:
  • Standard:BS, JIS, GB, DIN, ASTM
  • Standard:BS 1387, BS 4568, BS 31, JIS G3101, J...
  • Grade:10#-45#, A53-A369, Q195-Q345
  • Grade:10#, 20#, 45#, A53(A,B), Q235, Q345, Q19...
  • Thickness:0.8 - 15.0 mm
  • Section Shape:Round
  • Outer Diameter:20 - 350 mm
  • Place of Origin:TIANJIN  China (Mainland)
  • Secondary Or Not:Non-secondary
  • Application:Structure Pipe
  • Technique:ERW
  • Certification:CE
  • Surface Treatment:Galvanized
  • Special Pipe:Thick Wall Pipe
  • Alloy Or Not:Non-alloy
  • Length:3-15m
Detailed Description  
Detailed introduction to ERW galvanized pipe BS1387:

 

We are a manufacturer of steel pipe in China. Our products include welded pipes, hot-dip galvanized steel pipes, electro galvanized steel pipes, power coated steel pipes, EMT conduit and post pipes.
1.Product name: ERW galvanized  pipe BS1387
2. Brand Name: EFYA
3. Origin Of Place: TIANJIN, China
4. Export Percentage: 91%-100% 
5. Main Markets: Africa Oceania  Mid East  Eastern Asia Western Europe
6. Management Certification :  ISO 9001:2000   ISO 9001:2008   ISO 14001:2004
7. Test: Chemical Component Analysis, Mechanical Properties (Ultimate tensile strength, Yield strength, Elongation), Technical Properties ( Bending Test, Blow Test, Impact Test), Exterior
8. Size Inspection, Hydrostatic Test, X-ray Test
9. Mill Test Certificate: EN 10204/3.1B
10. Third party inspection: SGS, BV, Lloyds etc
11. Features:
1)Made of quality welded tubes by advanced galvanizing equipment and technology.
2) With good finish, high corrosion resistance and pressure-withstanding capacity.
Steel Grade
Q195-Q345, 10#-45#
Standard
BS, ASTM, DIN, JS
Zinc Coating Mass
200-400g/m, 80-140g/m
Specification
Round Section       Square/Rectangular Hollow Section
Outer Diameter
21.3-219mm
Wall Thickness
0.8-15.0mm
Inside Diameter
EN15-EN291.1
 
Length
3m,5.8m,6m,8m or according to customer’s requirement
Processing Technique
Threading, swaging, punching, flat squeezing etc
Packing
In bundle, in tray or according customer’s requirement
Usage
Structure /gas/fluid/oil/chemical fertilizer pipe etc
MOQ
3000Tons
Delivery time
20-30 days
Payment term
T/T, 30%payment in advance or L/C At Sight
Place of Origin
TIANJIN CHINA