Product Main

Specifications

1       CHASSIS
              Total Weight                        25T
Manufacture/Model              Dong Feng/ DFL1250A8
        PTO                    One PTO is fixed on the truck’s transmission, and the hydraulic parts are driven when the transmission drive the hydraulic pump; Through the belt connected with the pneumatic clutch, it will drive the vacuum pump
        POWER                      198kw
        TORQUE                     900N.m
        Wheelbase                    4600 + 1350 mm
        Out Dimension                9760×2490×3850
 Kerb Weight                  14320kg
       
             
2      Pressure/Vacuum Tank
              shape                                  cylinder           16MnR or Q345-D
              Dirty water tank                   9500L
        Material                 stainless steel
              Thickness                            6mm
              Dish end thickness               6mm
              Design Pressure                   total vacuum
              Work Pressure                     -0.9bar
              Strengthen Ring          cool bended U shape. Add the strengthen ring on the tank
 out circle.
        Tipping Hydraulic         For convenient tipping at 45degree angle, one heavy
tipping hydraulic pump is fixed.
Safety Support                     fix with safety valve during working
              Lever Detector                     Fix one lever detector on the rear, top and bottom of the tank for clearing the sullage.
              Over Pressure Device      Fixed on the top of the tank
        Vacuum valve             For keeping the tank’s inside vacuum
              Sewage Discharge valve    the stainless steel discharge valve is fixed on the rear used
for keeping the tank’s rear clean
 
3       Rear Cover
              Operation                            Opened by hydraulic
                           
4      Vacuum Pump
              Model                                 Europe Brand/ water cooling type
                            Assembly                            assembly between the wheelbase
              Gearing Device                    In the cab
              Pump Protection                 1.fixed the deflation valve in the tank;2,filter;
3. automatic vacuum inspecting valve
5. The mini washing system                                              
            Pressure hose         20m length, ND25mm(1″). The pressure hose with pneumatic water pressure regulation device
6.     Suction Boom                                                                  
Diameter                             4”
              working radius                     3680mm-5030mm
              Place                                   Top of the tank
              Material                               Low carbon steel and bended pipe
              horizontal location                hydraulic twisting 270degree on horizontal
              vertical location                    Lift 2770mm
              Depth                                  down 1420
              Suction Boom                      flex by hydraulic ,each 1350mm.
              suction pipe                         4”pvc
              suction valve                        pneumatic
 
. 7      Suction Pipe
              Diameter                             100mm(4”)
              Material                               PVC spire strengthen hose
              Accessories                         4” single way valve
              PIPING Work                    All the pipe are fixed on the top of the gemel, even when
the tank is tipping ,it is still able to work
8         Sub-Frame   
Sub-Frame              Made of high strengthen steel, and assembled according to
the truck construction.
Gemel Shaft             One strong, easy operation gemel device is assembled on
the tank rear
              Tank Support         the flexible rosin supporting matches on the front of the tank
 
9        Hydraulic Device      
 
              Hydraulic pump           assembly the necessary hydraulic pump
              Fuel Tank                big diameter fuel tank
              Control                                We can assembly one working light on the truck’s right
according to our customer’s request
Brand                   Walvoil&Oleostar
 
10      Additional Safety Devices      
              Emergency Stop                   Fixed on the main control panel
              Working Light                      We can assembly one working light on the truck’s right
according to our customer’s request
 
11      Devices 
              Hose Box        We fix the whole length steel hose box on the right side of the truck
              Hose                                   Not Provided
              Tool Box                             One lockable water proof stainless steel tool box
       Traffic Rule               All the devices are complied with the traffic rule
        mud guard               PVC mud guard
 
12      Control
              Control                         Provide all easy control system
              Assembly                     All the controlling devices and where to be fixed are all
confirmed after we talked with our customers
              Control                          All the control devices are in one water proof box.
              Marks                            Make clear marks on the necessary places of the whole truck
 
13      Painting
              Outside
Sandblasting      all the steel and stainless steel parts are sandblasted before painting
Painting                        Primer and final painting
              Logo                paint customer’s logo