Product Main

Specifications

1. Up to 72 Cavities
2. Provide 3D drawing
2. OEM Service Avaliable
3. Hot Runner System
4. Good After sales service

 
Plastic cap mould:
1,Excellent design
2.professional staff
3.send samples for inpection
4.save your cost
 
plastic cap mould:
 
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
 
Following information is essential for your better understand on our moulds:
 
Equipment list
  1. High speed milling center
  2. Milling center
  3. Numerical controlled EMD machine
  4. High speed EMD drilling machine
  5. Mirror EMD machine
  6. Quick wire cutting machine
  7. Slow wire cutting machine
  8. COMERO
  9. Large grinding machine
  10. Precise grinding machine
 

 

Name  Description
Products' info we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#,50#,P20,H13,718,2738,NAk80,S136,SKd61 etc
Mould Base LKM,HASCO ect .
Cavity Multi
Runner  Hot/cold 
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG,PROE,CAD,CAE,CAM,CAXA ect 
Plastic Material PP,PC,PS,PE,PU,PVC,ABS,PMMA ect 
Mould Life 300,000-3,000,000 shots 
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 30% of Deposit by T/T,70% of Balance by T/T
Delivery Time 15-60days 
Specification  Depends on customers requirements 
 

 

Business Step 
1.R&D We support customer R&D. Make the files or improve the design if you needed 
↓↓↓
2.Quotation Making Mould Quotation will be finished in 1 day according to information we get
↓↓↓
3.Negotiation The quality ,price ,material,delivery time .payment item.ect 
↓↓↓
4.Mould Design  3-5 days for mould and product 3D/2D drawing design
↓↓↓
5.Mould According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 25-60 days
↓↓↓
6.Mould Testing When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference.
↓↓↓
7.Sample shoot If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory 
 ↓↓↓ 
8.Delivery Delivery goods by sea or by air ,according  customers requirement