1. Up to 72 Cavities
2. Provide 3D drawing
2. OEM Service Avaliable
3. Hot Runner System
4. Good After sales service
2. Provide 3D drawing
2. OEM Service Avaliable
3. Hot Runner System
4. Good After sales service
Plastic cap mould:
1,Excellent design
2.professional staff
3.send samples for inpection
4.save your cost
1,Excellent design
2.professional staff
3.send samples for inpection
4.save your cost
plastic cap mould:
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understand on our moulds:
Equipment list
- High speed milling center
- Milling center
- Numerical controlled EMD machine
- High speed EMD drilling machine
- Mirror EMD machine
- Quick wire cutting machine
- Slow wire cutting machine
- COMERO
- Large grinding machine
- Precise grinding machine
Name | Description | ||||
Products' info we need to make quotation | Clear Pics/material/size/weight/wall thickness/targetting quantity and etc. | ||||
Mould Material | 45#,50#,P20,H13,718,2738,NAk80,S136,SKd61 etc | ||||
Mould Base | LKM,HASCO ect . | ||||
Cavity | Multi | ||||
Runner | Hot/cold | ||||
Mould Design | 3D/2D Drawing | ||||
Design Days | 3 days | ||||
Design Software | UG,PROE,CAD,CAE,CAM,CAXA ect | ||||
Plastic Material | PP,PC,PS,PE,PU,PVC,ABS,PMMA ect | ||||
Mould Life | 300,000-3,000,000 shots | ||||
Injection System | Pin-point-gate | ||||
Polish System | Mirror Polish | ||||
Payment | 30% of Deposit by T/T,70% of Balance by T/T | ||||
Delivery Time | 15-60days | ||||
Specification | Depends on customers requirements |
Business Step | |||||||
1.R&D | We support customer R&D. Make the files or improve the design if you needed | ||||||
↓↓↓ | |||||||
2.Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓↓↓ | |||||||
3.Negotiation | The quality ,price ,material,delivery time .payment item.ect | ||||||
↓↓↓ | |||||||
4.Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓↓↓ | |||||||
5.Mould | According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 25-60 days | ||||||
↓↓↓ | |||||||
6.Mould Testing | When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference. | ||||||
↓↓↓ | |||||||
7.Sample shoot | If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory | ||||||
↓↓↓ | |||||||
8.Delivery | Delivery goods by sea or by air ,according customers requirement |