Main mould material: 50# steel, P20, 718#
Customers' specifications are acceptable
Mould and tooling design services is available
Lead time: 2-3 weeks
All of the moulds can be well tested before the shipments.
Videos for testing the moulds are available
Good packages to avoid any damages during the long transportation
Customers' specifications are acceptable
Mould and tooling design services is available
Lead time: 2-3 weeks
All of the moulds can be well tested before the shipments.
Videos for testing the moulds are available
Good packages to avoid any damages during the long transportation

