Total power | 17W |
LED consumption | 14W |
Input voltage | AC90-250V, 50/60Hz |
Driver output | 35-42VDC/380-400mA |
Tube input | 40VDC/380-400mA |
Power supply | internal constant current |
Lighting source | low power 3528/3014/5050 LEDs |
LED quantity: | 240pcs |
Dimension | 28mm*25mm*1170mm |
Material | aluminum PCB and housing & PC cover |
Luminous flux | 1400lm±10% (frosted) |
Luminous efficiency | 75–85lm/W |
Color temperature | 3000-3500K, 4500-6500 K, 6500-9000K |
Viewing angle | ≤120 ° |
CRI | Ra﹥70 |
Working temperature | -20~40℃(-4~104 ° F) |
Environment humidity | <95﹪ |
Working environment | indoor use |
Life-span | 50,000 hrs |
Weight | 360g (net) |
Certification | CE, RoHS and FCC |
Warranty | 2 years |
Module
ZRG-T5-1200-GSP14-E1 (transparent PC cover)
ZRG-T5-1200-GTP14-E1 (stripe PC cover)
ZRG-T5-1200-GDP14-E1 (frosted PC cover)
Features:
1 No RF interference, no flickering or buzzing.2 Maintenance free, easy installation.
3 Low power consumption, high intensity.
4 Solid-state, high shock/vibration resistant.
5 Instant start without flickering.
Applications:
For your specialized lighting needs, it provides lighting fixtures built to withstand the rigors and dangers of emergencies as well as those ever-present in hazardous areas. Our line of explosion proof lighting products is built with user safety as the number one concern. With features resistant to external factors such as heat and pressure, Eastar’s lighting solutions also offer sustainability in our line of explosion proof lighting products.
1200mm Mini Bracket T5 LED Tube Lighting Installation
Mounted or Hanging
1 Drill 2 holes on the wall, put the expansion rubber plug into the wall
2 Screw the spring
3 Connect the plug cable with the bracket
4 Fix the bracket into the spring
5 Connect the wire, blue for “+”, yellow for ground.
Mounted or Hanging
1 Drill 2 holes on the wall, put the expansion rubber plug into the wall
2 Screw the spring
3 Connect the plug cable with the bracket
4 Fix the bracket into the spring
5 Connect the wire, blue for “+”, yellow for ground.
Company introduction
As a leading LED manufacturer and exporter, Shenzhen Eastar Electronic Co., Ltd has been in
LED business for over 7 years. Totally 500 staff, annual sales reach 40 billion USD. Our
30,000-square-meter ISO 9001:2008 certified factories is outfitted with advanced production
equipment, such as high speed Yamaha SMT machines, precision chip placers, reflowing
soldering machines and wave soldering machines, integrating spheres, thermal analyzers,
spectrum analyzers, viewing angle testers, vibration testers and intelligent aging rooms.
All of them make our led tube production arrive to 600,000 units monthly.
Our R&D team has 30 people with average 6 years of experience. We can create 6-8 new
designs per month and tailor a customized sample in 7 days. With an investment of 5.2% of
profit in R&D, 4.8% on system establish, such as ERP soft management system, 4% on staff
training. With all of these, Eastar will make innovation continuously and stay at the
frontier of the LED industry.
Our LED products include LED TUBES, LED PANEL LIGHT, LED SPOTLIGHT and LED DOWN LIGHT. Led
tubes include 4 models, common model, dimmable model, rotatable model and explosion-proof
model, each model have 6 sizes for your choice. They are 600mm, 900mm, 1200mm, 1500mm,
1800mm and 2400mm. Led panel lights include common led panel light, dimmable led panel
light and colorful led panel light, three models and each model have 300*300mm, 600*600mm,
300*600mm, 600*1200mm and round shape for choice. Led spotlights include candle shape
spotlight, MR16 series spotlight and AR111 series spotlight. Led down lights includes
5inch, 6inch, 7inch and 8inch sizes. Other, we can customized products for our customers.
Our products carry CE, FCC and RoHS. UL/CUL certificates are under application. 2-year
warranty is ensured at least.
To keep consistence, we use chipsets from Cree, Nichia and Epistar. Before delivery, our 35
QC team will carry out stringent tests to control led lights quality. Usually the delivery
time for volume orders is 15 days. Before delivery, our QC team will check the products
condition and description.
With first-class experience in production and factory management, our attention to the
quality is unrivaled. Our high level cost control makes sure good quality with competitive
price. As a trustful partner of many clients around the world, we will make your global
sourcing pleasure and will be the one you trust mostly in led light industry.
Contact with our over 30 professional sales speaking 6 languages who have excellent
communication skill today. We will reply to you within 24hours and bring a top service to
you.
Eastar---Lighting Your World!
Eastar---The Partner You Trust!