1. Not with the power cable. About power supply, please consult with Bigong Si.
2 heat-treated load chain, can not be spliced ??using, please note.
3 canvas bags as a standard system of chain chain of bags, bags of steel chain, matching items.
4 head (load chain), button line of control, power supply, such as the length of the cable beyond the standard specifications, please consult with Bigong Si.
5 methods of operation for the monorail with a 5-point (up and down, horizontal) button, Crane with 7-point (up and down, horizontal, vertical) button.
6 operating voltage is 24V low voltage. If you choose to operate a crane with a 7-button controller, please use another crane control box.
7 button controller comes standard with an emergency stop button. Press the emergency stop button can be easily cut off the motor circuit.
8 on the same track when using more than one hoist may cause collision with each other, need to install a buffer.
9.2 units at the same time lifting the time, follow the gourd unilateral lifting the rated load to the load requirements of the selected electric hoist. 3 sets while lifting time, please consult in advance with Bigong Si.
2 heat-treated load chain, can not be spliced ??using, please note.
3 canvas bags as a standard system of chain chain of bags, bags of steel chain, matching items.
4 head (load chain), button line of control, power supply, such as the length of the cable beyond the standard specifications, please consult with Bigong Si.
5 methods of operation for the monorail with a 5-point (up and down, horizontal) button, Crane with 7-point (up and down, horizontal, vertical) button.
6 operating voltage is 24V low voltage. If you choose to operate a crane with a 7-button controller, please use another crane control box.
7 button controller comes standard with an emergency stop button. Press the emergency stop button can be easily cut off the motor circuit.
8 on the same track when using more than one hoist may cause collision with each other, need to install a buffer.
9.2 units at the same time lifting the time, follow the gourd unilateral lifting the rated load to the load requirements of the selected electric hoist. 3 sets while lifting time, please consult in advance with Bigong Si.

