Product Main

Specifications

Used Alsthom PG6551B gas turbine CCPP
 
Gas Turbine/Generator Unit
(1)   GT Model: PG6551B 
(2)   Capacity: 36MW
(3)   GT Manufacturer: European Gas Turbine-EGT
(4)   GT Control system: Mark V
(5)   Manufacturer of load gearbox: France Flender-Graffenstaden
(6)   Manufacturer of generator: France Alsthom
 
HRSG
Manufacturer: HangZhou Boiler Co. (China)
Model: Q393/542-66-3.82/450
Style: horizontal arrangement, single pressure, self-deoxygen, self-circling.
 
Steam Turbine/Generator Unit
Manufacturer of steam turbine: Harbin Steam Turbine Ltd., Co. (China)
Steam turbine model: N15-3.6/445
Generator Manufacturer: NanJing Steam Turbine Group Co. (China)
Model: QFW-15-2-10.5
Capacity: 14MW
 
DCS system:
(1)Model: Freelance 2000
(2)Manufacturer: ABB
 
Other Info.
(1)   The power plant project started to build in 1998.
(2)   Simple cycle COD: Sep., 1999
(3)   Combine cycle COD: Apr.,2003
(4)   Gas turbine operation hours so far: 8031.4 hours for burning light diesel fuel, firing times: 748.
(5)   Steam turbine operation hours: 5720.7 hours, operation times: 426.
Under ISO working conditions: the gas turbine output is 36MW, steam turbine output 14MW while burning light diesel fuel.
 
pls contact Ms. Mina Wang for more details