| 1, The chart of process flow | ||||||||
| Process:Decoiler--Feeding & punching--Roll Forming--pressing--cut-to-length --Colletion (Finished goods) | ||||||||
| 2, Main equipment | ||||
| Decoiler | 1set | |||
| Main forming machine | 1set | |||
| PLC control system | 1set | |||
| Hydraulic system | 1set | |||
| Pressing device | 1set | |||
| Cutting device | 1set | |||
| Product stand | 1set | |||
| 2 | Decoiler | |
| Coil inner diameter: | ||
| Max width of coiling: | ||
| Max weight of loading: | ||
| 3 | Main forming machine | |
| Shaft material:45# steel,bearing steel outer diameter 85mm | ||
| Main motor power:5.5KW | ||
| Forming speed:8-10m/min | ||
| Voltage:380v,50Hz | ||
| Roller station:10 | ||
| 4 | Pressing device | |
| 5 | Cutting system | |||||||
| Hydraulic cutter | ||||||||
| Blade and mould material:Cr12 steel with quenched treated 60-62° | ||||||||
| 6 | Control system | |||||||
| PLC: Taida from Taiwan | ||||||||
| Coder:from South Korea | ||||||||
| 7 | Hydraulic system | |||||||
| Advanced hydraulic system from Taiwan | ||||||||
| Terms | ||||||||
| 1 | Payment | 30% of the total value paid by T/T as down payment, the rest 70% to be paid by T/T after inspection by buyer in seller’s factory while before delivery. | ||||||
| 2 | Delivery | 30 working days after receipt of advance payment | ||||||
| 3 | Package | Standard export package | ||||||
| 4 | Warranty | 12 month,and we will provide technical support for the whole life of the equipment. | ||||||

