Product Main

Specifications

Metallurgy Machinery :CCM Parts:
1. with high production capacity: the workshop to ensure all aspects are focused on high production capacity, such as replacement of cast roll can be completed within 10 minutes, roll both ends of the side of the dam casting refractory life to allow at least three continuous casting ladle furnace 110t.
2 .Products: Cast Strip (Castrip) device to produce thin and wide, low-carbon steel coil, as only a small amount before the end-use products require pickling and cold rolling. Production of ultra-thin Cast Strip unit without cold-rolled galvanized steel coil after the commercial has been very good satisfaction.
3. casting roll diameter: BHP and IHI's experience has proved a big cast roll diameter (1000mm and larger) on the investment and operating costs are more expensive, Nucor plant will be cast with a casting roll with a diameter of 500mm, the use of small diameter Another major benefit roll casting is to allow the ends of the casting rolls using the cheaper side of a small dam to block the molten steel.
 4. Features: Cast Strip device products in appearance and surface characteristics on the range between hot rolled coil and cold rolled coils.
5. allows the use of poor quality scrap: As the liquid steel in milliseconds for rapid cooling, Castrip plant production of ultra-cold steel (Hypercooled Strip) technology will significantly reduce the residual product of segregation, heat will no longer be a brittle problem. Reduce the melting point of steel grain boundary segregation of residual intergranular no access to these, so allow the use of steel-making residual elements (Cu, Cr, Ni, Mo ... ...) a little higher quality, less scrap.
All pictures below are took in our workshop. If there is anything we can do for you, please feel free to contactwith us. 
 
Zhangjiagang Changxin Machinery Co., Ltd
High quanlity
Certified with ISO9001:2000 Quality System
Brand name
Our brand is Changxin, if you need us to put your own logo on product. It is ok
Packing Size
According to products’ size and quantity
Packing method
Wooden case or as per customers’ requirements
Delivery time
45 days after received deposit
Minimum order
As per clients’ requirements
OEM
YES, we can manufacture the parts according to customers’ drawings