Besco cut to length line,coil cutting line,steel coil cut to length line
1, Easy operation 
2, High speed 
3, ISO9000:2001 certification 
4, High precision 

 
Specification of cut to length line,coil cutting line,steel coil cut to length line:
 
Materials of Processible Coiled Plate Coiled Plate Cold & Heat Rolled Steel,
Acid Pickling Steel Sheet
Thickness of Coiled Plate 8.0-16 mm
Width of Coiled Plate 1000-2100 mm
Coil Inner Diameter ø 500 mm-ø 760 mm
Coil Outer Diameter ≤ ø 2200 mm
Weight of Coiled Plate ≤ 30T
Specification Parameters
 
Technical parameters of cut to length line,coil cutting line,steel coil cut to length line:
1. Leveling Speed 0 – 15 m/min
2. Accuracy of Length Cutting ≤±1.0mm/2M
3. Accuracy of Diagonal ≤±2mm/2M
4. Cutting Speed for Materials ≥ 5 pcs/min (According to 3000 mm Length)
5. Stack-Up Table Elevator Loading Weight 5000 kgs
6. Stack-Up Length Range 3000 mm, after running-out.
7. Minimum Cut-Off Length 350 mm
8. Maximum Stack-Up Height Range 400 mm
9. Motor Main Power 160kw, approximately
10. Machine Occupy Space 28000 x 6000 mm, approximately (L x W)
 
Equippment of cut to length line,coil cutting line,steel coil cut to length line:
1. Charge Wagon 1 set
2. Hydraulic Single-Head Decoiler 1 set
3. Hydraulic Guiding Panel Device 1 set
4. Hydraulic Feeding Device 1 set
5. Roller Table 1 set
6. Limit Table 1 set
7. 2 Rollers for Cut-to-Length & 5 Rollers for Leveling Machine 1 set
8. Measuring Table 1 set
9. Tailgate Feeder 1 set
10. Hydraulic Shearer 1 set
11. Run Out Table 1 set
12. Thrower 1 set
13. Stacker 1 set
14. Pneumatic Arrangement Machine 1 set
15. Hydraulic Stand 2 sets
16. Electronic Control System 1 set
 
Terms of payment of cut to length line,coil cutting line,steel coil cut to length line
By T/T, 30% as deposit and the balance 70% before shipment.
 
Delivery date of 
145 DAYScut to length line,coil cutting line,steel coil cut to length line
 
Installation of cut to length line,coil cutting line,steel coil cut to length line
--- 1 year guarantee for spare parts is included in quotation.
--- The operator training in our factory is free.
--- The technician could be sent for installation and operator training at site, but the fee should be discussed separately.