YCATS2 Single Phase Energy Meter Automatic Test Line
- Accuracy: 0.05%
- Each meter position unit with a power source and connect in parallel. The unit is totally separate, don't affect each other, eliminating the effect of large power output on stability of power source. Reducing error, improving accuracy.
- The break down power source or MUT only affect one meter position unit, other position working normally. System is more reliable.
- More meter position, less installation waiting time. Effective testing time is shorter, only 30% time of normal test way.
- The meter with different testing range, constant, protocol can be tested together because each meter position unit is in parallel, will not affect each other.
- Testing single phase meter with close link.
- Meter position unit expansion is convenient
- Automatic meter entry/out and testing, PC control by Ethernet communication.
- Flow of work: meter entering, identification, location, testing, defective sorting, labeling, lead sealing, packing, return to meter’s warehouse.
- Function include:
Error test
Starting and creeping test
Time base test
Time consumption switch test
Demand test
Withstand voltage test
Influence test
Dial test