Color: Silver white or Based on the customer's requirements.
Package: wrapped with felt cloth or rubber mat and fix them by iron wire in case of collision or bump
Terms of Payment: T/T
Minimum Order Quantity:1set
Port of Loading: Tianjin Port
Delivery Time: one month or based on the customer's needs.
Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards).
Welded requirements:
1 We used CO2 welding and submerged arc auto welding or other methods.
2 Welded seam shall be full penetration and grinded.
3 The welded product has no fissure, scar, overlap, layer or other defects.
Galvanization:
All components are dip-hot galvanized with uniform.
Certification:
We also supply Factory accept test, Warranty certification, Certificate of product quality
Certification of Quality Management System
Our all products are in conformity with GB/T19001-2000idt ISO9001:2000.
Package: wrapped with felt cloth or rubber mat and fix them by iron wire in case of collision or bump
Terms of Payment: T/T
Minimum Order Quantity:1set
Port of Loading: Tianjin Port
Delivery Time: one month or based on the customer's needs.
Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards).
Welded requirements:
1 We used CO2 welding and submerged arc auto welding or other methods.
2 Welded seam shall be full penetration and grinded.
3 The welded product has no fissure, scar, overlap, layer or other defects.
Galvanization:
All components are dip-hot galvanized with uniform.
Certification:
We also supply Factory accept test, Warranty certification, Certificate of product quality
Certification of Quality Management System
Our all products are in conformity with GB/T19001-2000idt ISO9001:2000.