Application: Used in TRT power generation system.
Usage: It is used to cut off the air supply timely when something wrong happened to the main engine in order to protect the main engine and ensure the blast furnace is working meanwhile.
Operating Medium: Purified gas
Working Temperature: ≤300℃
Operation: Bothe hydraulic and pneumatic
On/Off period: ≤1s
Size and Model: DN800~DN2200 ?
BF Capacity: 450m³~2500m³
Usage: It is used to cut off the air supply timely when something wrong happened to the main engine in order to protect the main engine and ensure the blast furnace is working meanwhile.
Operating Medium: Purified gas
Working Temperature: ≤300℃
Operation: Bothe hydraulic and pneumatic
On/Off period: ≤1s
Size and Model: DN800~DN2200 ?
BF Capacity: 450m³~2500m³