No | ITEM | Unit | Quantity | MODEL |
1 | Axle | Piece | 2 | 14T BPW |
2 | Tyre | Piece | 8 | Aeolus 12.00R-20 |
5 | Rim | Set | 8 | Domestic 8.5-20 |
3 | Tire carrier | Set | 1 | Cage type |
6 | Suspension | Set | 2 | CIMC HUAJUN Suspension |
7 | leaf-sping | Set | 4 | 90width*12pieces*16 thickness |
8 | Turnplate | piece | 1 | 20T double raceways |
9 | Draw ring | Set | 1 | German type copy |
10 | Toolbox | Set | 1 | The big waterproof toolbox that can be unloaded |
11 | Braking system | Emergency relay valve | 1 | WABCO |
Air reservoir | 2 | 50L | ||
Double braking chamber | 2 | 30/30 spring brake chamber on front axle | ||
Single braking chamber | 2 | 30,brake chamber on rear axle | ||
Tie-in | 1 | Haldex | ||
12 | Electrical system | Set | 1 | 24 volt electrical system.7 pin electrical connector.parking .stop,reverse,number plate and indicator lights.rear lights conform to European standard,rear front and side reflectors |
Main Specification of Trailer | ||||
NO | Specification | Numerical value | ||
1 | Overall dimension(L*W*H) | 8000*2690*1700 | ||
2 | Side panel | Lower sideboard 800,upper fence 800+clearance 100,removable | ||
3 | Wheelbase(Mm) | 4900 | ||
4 | G.V.W(kg) | 7000(approximate) | ||
5 | Rated Payload( kg) | 30000 | ||
6 | Main material of the trailer and manufacture technology |
MAIN MATERIAL OF THE CHASSIS, MAIN BEAM, Q345 CARBON STEEL/ SIDE BEAM,16#U channel CROSS BEAM, Q235 CARBON STEEL(80*40square pipe) |
||
MAIN MANUFACTURE TECHNOLOGY USING TECHNOLOGY OF BLASTING AND PAINT THE EPOXY ZINC RICH PRIMER TO DEAL WITH THE SURFACE OF RAW MATERIAL AND THE COMPLETE VEHICLES |
||||
7 | The mainbeam of the semi-trailer |
UPPER & LOWER WING-PLATE (MM) THICKNESS, UPPER, 14 MM LOWER, 16 MM MATERIAL, Q345 CARBON STEEL |
||
MAIN BEAM (MM)THICKNESS, 8MM MATERIAL, Q345 CARBON STEEL HEIGHT OF THE BEAM, 350MMNUMBERS, 2 SETS MAIN MANUFACTURE TECHNOLOGY USING HIDDEN ARC WELDING TO WELD THE MAIN BEAM USING GRIP BLASTING AND THE EPOXY ZINC RICH PRIMER TO DEAL WITH THE SURFACE OF THE BEAM |
||||
8 | Painting system |
THE STEEL OF THE VEHICLES COME TO THE GRADE SA2.5 AFTER BLAST.THREE LAYS FOR THE PAINT, COLOR, DEPENDING ON THE CUSTOMER |
||
9 | Payment terms | 30% TT in advance,the rest should be paid 10 days prior to the delivery time | ||
10 | Delivery date | 20 days after the deposit and the confirmation of the drawing. |