Product Main

Specifications

Supersonic Cavitation  Cavitacion Slimming Machine
1Ultrasonic cavitation
2Cavitation body shaping,cellulite removal
3 Cavitation:2 probes
4 Cavitation: CE
 
APPLICATION
*Intensive physical lipolysis to remove surplus fat
*Burn surplus fat, Lymphatic Treatment, skin tightening, improve skin elasticity
*Improve orange peel organization, body shaping
 
FEATURE
*Unique design enjoys national patent, 2 treatment probes, big advantage in market
*Adopt the leading-edge technology ultrasonic lipolysis in the world today
*Suitable to all kinds of skin and people
*Comfortable, no pain, no scar in treatment
*Easy to operate
*Lower investment and higher income
*Quick treatment, not affect people' normal life
Our difference with the rest of devices existing in the market:
 
 Variable frequencies depending on the chosen treatment.
 Frequency of steady emission.
It does not present any contagious risk.
It is very bearable.
 Visible results from the very first session.
 Maximum security for the client, default programs.
Painless
Permits to adapt the used power used according to the zone and deepness to work.
Under current rules.
 Biocompatible material
  
PARAMETER
*2Probe
Deep Probe:25KHz with photon
Middle Probe:40KHz
*Energy:3-6W/cm2 can adjust
*Voltage:110V or 220V
*Power:150W
*Frequence:25K+40KHz
*Active Surface:20cm2
*Operate timer:1-20min
*Display:8.4inch touch screen
*Emission model:Scan 2% compared with autotuning Frequence
*Funcionality pressure:500mbar-1060mbar
*Certifications:CE LVD,CE EMC
*Pakcge size:52*54*125 cm
*N.W:45kg
*G.W:70kg
 
WARRANTY
*3years free warranty for replace the parts
*Only in Frist year,RUIPU MEDICAL offer the express charge for shipment the parts.
*Online instruct
*When order is more than 10pc,RUIPU MEDICAL will offer one sets parts.
Include:Filter,handle,touch screen,Power board…
 
PAYMENT TERMS
*T/T before shipment or Paypal
 
SHIPMENT METHOD
*Ship by Express to door need 4-5days.(DHL.TNT.UPS.FEDEX.EMS)
*Ship by Normal air to airport need 5-7days.
*Ship by sea from Ningbo port need 30-40days.