Product Main

Specifications

Machine configuration

1 the main machine (casing and rotatable reactor)
2 sub-air package(with catalyst tower)
3 condenser for oil(tank cooling, coil type cooling, tubular cooling)
4 light oil tank
5 heavy oil tank
6 water sealing
7 water pool
8 cooling tower
9 condenser for flue
10 fan
11 reducer
12 dedusting system
13 waste gas combustion chamber
14 feeding system(conveyor belt)
15 auto dreg system(carbon black come out )
16 take out steel machine
17 electric cabinet


Add:
Responsible for equipment manufacturing, our work and guide installation and debugging
Second, equipment installation ends, we entrust technical personnel and assist the buyer's guide, and the staff of the production of technical training for staff, so as to facilitate the buyer to staff production skills.
Third, equipment (including accessories) (human factors and wear parts, except one year guarantee) all non-standard parts according to gb, if we provide equipment instructions and normal production and operation process, we should be unconditional to damage the deployment.
Fourth, we provide free catalyst formula for the buyer.