Product Main

Specifications

Good quality and competitive price
3 axle 40ft Flatbed semi-trailer with side wall
No
ITEM
Unit
Quantity
MODEL
1
Axle 
Piece
3
 FUWA-13T
2
Tyre 
Piece
12
1100R20 Radial TYRE
3
Rim 
Piece
12
8.0-20
4
Suspension
Set
1
CIMC HUAJUN Suspension 
5
Leaf-sping 
Set
6
90width*10pieces*13 thickness
6
Kingpin 
Piece
1
2" welded type.JOST
7
Landing gear
Set
1
JOST D200
8
Braking system
Emergency relay valve
1
WABCO
Air reservoir
2
50L
Double braking chamber
2
30/30 spring brake chamber on front axle
Single braking chamber
2
30,brake chamber on rear axle 
Tie-in
1
Haldex 
9
Electrical  system 
Set 
1
24 volt electrical system.7 pin electrical connector.parking .stop,reverse,number plate and indicator lights.rear lights conform to European standard,rear front and side reflectors
Main Specification of Trailer
NO
Specification 
Numerical value
1
Overall dimension(L*W*H)
12380*2500*1450/side wall, 600High
2
Wheelbase(Mm)
1310
3
G.V.W(kg)
8000(approximate)
4
Rated Payload( kg)
40000(approximate)
5
Main material of the trailer  and manufacture technology
MAIN MATERIAL OF THE CHASSIS,
MAIN BEAM, Q345 CARBON STEEL/
CROSS BEAM, Q235 CARBON STEEL(square pipe steel)
MAIN MANUFACTURE TECHNOLOGY
USING TECHNOLOGY OF BLASTING AND PAINT THE EPOXY ZINC RICH PRIMER TO DEAL WITH THE SURFACE OF RAW MATERIAL AND THE COMPLETE VEHICLES
6
The mainbeam of the semi-trailer
UPPER & LOWER WING-PLATE (MM)
THICKNESS, UPPER, 14 MM LOWER, 16 MM
MATERIAL, Q345 CARBON STEEL 
MAIN BEAM (MM)THICKNESS,  8MM
MATERIAL, Q345 CARBON STEEL
HEIGHT OF THE BEAM, 500MMNUMBERS, 2 SETS
MAIN MANUFACTURE TECHNOLOGY
USING HIDDEN ARC WELDING TO WELD THE MAIN BEAM
USING GRIP BLASTING AND THE EPOXY ZINC RICH PRIMER TO DEAL WITH THE SURFACE OF THE BEAM
7
Painting system 
THE STEEL OF THE VEHICLES COME TO THE GRADE SA2.5 AFTER BLAST.THREE LAYS FOR THE PAINT,
The paint thickness will be about 80---100 microns in total
COLOR, DEPENDING ON THE CUSTOMER
8
Payment terms
30% TT in advance,the balance should be paid 10 days prior to the delivery time
9
Delivery date
20 days after the deposit and the confirmation of the drawing.