AAC Plant mainly includes 5 sections as below: 1. Raw material section -Jaw crusher, bucket elevator, electromagnetic feeder, ball mill, slurry pump, rotary screen, etc. 2. Pouring section -lime, cement silo, screw conveyor, cement and lime measuring tank, pneumatic valve etc. 3. Pre-curing section -ferry push, mould, bottom board, hardening car etc. 4. Cutting section -cutting machine, hoist, brace. 5. Steaming section -traction machine, kettle, boiler. AAC Plant: 1. The raw material is stored in the material storehouse, after according to the automatic batcher then enter into the pouring mixer. 2. Pour and enter to the mould after mixing evenly. 3. After precuring a certain temperature for a period of time, the base body reach a certain of hardness, the mould and base body are hung to the cutting machine by the sling. The sling is fulfill the following functions: 1)Titling the mould 90° In the air(one side plateof the mould become the bottom to support the base body ubtil the finished product is steamed). 2)Hanged to the cart or the cutting support to open mould or demoulding. 3)The demoulded frame and returned side plate shall be reorganized into the mould and shall be ready for nest pouring after cleaning and oil spraying. 4. The base body then be cut on the cutting machine in six sides: 1)The base body carries on the side and cuts and mills the trough vertically. 2)Then carry on the vertical level to cut. 3)Cut horizontally finally. 5. The base body which is cut and the bottom are hanged to the steam-pushing car by the semi-product sling, then fed into the autoclave in groupe to be steamed under high temperature. 6. After a period of steaming, then leave the autoclave and is hanged by the sling. The hardening plates are returned. Aerated autoclaved concrete AAC Plant: AAC Plant Advantages: (1)light weight Areated concrete density is usually 400-700kg/m3, (according the market in produce ), same as 1/3 of clay brick and 1/5 common concrete. So use the Light brick can reduce the weight of the build more, and also reduce the beam of roof and pillar press best. Then you can see, it can save the material and cost, it also fighting shaking. (2) keeping temperature It has many are porous, the delivery hearting coefficient is 0.9-0.22W/(mk), the same as 1/4 or 1/5 of clay brick, so it is best materials now in the world. There are many kinds material, have lowest waste. (a) all kinds of raw materials reserve positions - (b) to measure ingredients- (c) raw material mixing water mixed- (d) Die prepared (e)- pouring- (f) cake moulding-(g) demoulding - (h) overturned, the level of cutting, vertical cutting- (I) grouped into the autoclave-(j) high temperature and high pressure steam-(k) discharge from the autoclave-(l) finished testing-(m)packaging-(n)-stacking storage (o)-Factory
AAC Plant mainly includes 5 sections as below: 1. Raw material section -Jaw crusher, bucket elevator, electromagnetic feeder, ball mill, slurry pump, rotary screen, etc. 2. Pouring section -lime, cement silo, screw conveyor, cement and lime measuring tank, pneumatic valve etc. 3. Pre-curing section -ferry push, mould, bottom board, hardening car etc. 4. Cutting section -cutting machine, hoist, brace. 5. Steaming section -traction machine, kettle, boiler. AAC Plant: 1. The raw material is stored in the material storehouse, after according to the automatic batcher then enter into the pouring mixer. 2. Pour and enter to the mould after mixing evenly. 3. After precuring a certain temperature for a period of time, the base body reach a certain of hardness, the mould and base body are hung to the cutting machine by the sling. The sling is fulfill the following functions: 1)Titling the mould 90° In the air(one side plateof the mould become the bottom to support the base body ubtil the finished product is steamed). 2)Hanged to the cart or the cutting support to open mould or demoulding. 3)The demoulded frame and returned side plate shall be reorganized into the mould and shall be ready for nest pouring after cleaning and oil spraying. 4. The base body then be cut on the cutting machine in six sides: 1)The base body carries on the side and cuts and mills the trough vertically. 2)Then carry on the vertical level to cut. 3)Cut horizontally finally. 5. The base body which is cut and the bottom are hanged to the steam-pushing car by the semi-product sling, then fed into the autoclave in groupe to be steamed under high temperature. 6. After a period of steaming, then leave the autoclave and is hanged by the sling. The hardening plates are returned. Aerated autoclaved concrete AAC Plant: AAC Plant Advantages: (1)light weight Areated concrete density is usually 400-700kg/m3, (according the market in produce ), same as 1/3 of clay brick and 1/5 common concrete. So use the Light brick can reduce the weight of the build more, and also reduce the beam of roof and pillar press best. Then you can see, it can save the material and cost, it also fighting shaking. (2) keeping temperature It has many are porous, the delivery hearting coefficient is 0.9-0.22W/(mk), the same as 1/4 or 1/5 of clay brick, so it is best materials now in the world. There are many kinds material, have lowest waste. (a) all kinds of raw materials reserve positions - (b) to measure ingredients- (c) raw material mixing water mixed- (d) Die prepared (e)- pouring- (f) cake moulding-(g) demoulding - (h) overturned, the level of cutting, vertical cutting- (I) grouped into the autoclave-(j) high temperature and high pressure steam-(k) discharge from the autoclave-(l) finished testing-(m)packaging-(n)-stacking storage (o)-Factory
 
Zhengzhou Dearye Heavy is a specialized AAC block machine supplier for AAC production plant, can supply a complete set of full automatic AAC production line with 50, 000, 100, 000, 150, 000, 200, 000, 250, 000, 300, 000, even 600, 000 capacity annual, including plant design, equipments installation, technical instruction, personal training, etc., and also we can design and manufacture as per clients' requirement.
 
 
Aerated concrete production section and corollary equipment
Stage
No.
Name
 
 
 
Raw materials processing stage
1
Jaw crusher
2
Bucket elevator
3
Storage bin
4
Vibrator feeder
5
Ball mill
9
Hopper
10
Belt conveyer
11
Storage slurry tank
 
 
 
Batching and Mixing & casting stage
12
White ash storage bin
13
Cement storage bin
14
Batching machine
15
Measuring tank
16
Air compressor
17
Screw conveyer
18
Mixing and casting machine
19
Aluminum mixer
20
Storage slurry tank
 
Rest-cured section stage
21
Ferry vehicle
22
Mould
23
Side-plate
24
Steaming larry 
 
Cutting and Coding stage
25
Cutting machine
26
Waste pulp mixer
27
Air-invert sling
28
Hoist
Steam-cured and out of autoclave stage
29
Autoclave
30
Boiler