Product Main

Specifications

 Laundry  basket  Mould/Mold  supplier
name  Laundry  basket  Mould  supplier
mould material P20,718,2738 etc.
cavity single  cavity
Shaping Mode Plastic Injection Mould
runner hot/cold  runner
mould design 3D/2D
design days 3-5 days
mould life 500,000~1million shots
plastic material PP HDPE etc.
injection system direct gate
steel hardness 36-52HRC(according to different steel)
payment 40% of deposit by L/C T/T 60% of balance by L/C T/T
delivery time 50-70 days
specification depends on customers' demand
 
Procedure of mould making
Step 1 place the order & receive the down payment
Step 2 Design and make the drawing( products& moulds)
Step 3 Customer check & confirm
Step 4 Steel material purchase
Step 5 Machine process(CNC, sparking machine, boring machine) & mould makers install
Step 6 Mould testing
Step 7 Send the samples to check
Step 8 Receive the balance & mould shipment
 
Our Main Business Line
1. Household Mould:Chair Mould,Chair Mould,Stool Mould,Table Mould,Bucket Mould,Basket Mould,Food Container Mould,Dustbin Mould, etc.
2. Industrial moulds: pallet mould, crate mould,Beer Crate Mould paint container mould ,etc.
3. packaging moulds: blowing mould, bottle mould, cap mould,etc.
4. PET Preform Mould
5. Pipe Fitting Mould:PPR pipe fittings,PE,PVC pipe fittings.
6. Thin Wall Mould:thin wall cup, thinwall tablewares, etc.
7. Home Appliance mould
8. Automotive parts: bumper mould, dashboard mould,etc.
9. Industrial Part Mould
10.Syringes Mould
 
Our Advantages
1. Good quality
2. Delivery on time
3. Rich experiences for mould making
4. Competitive price
5. Good After-sale service
6. Professional English communications with customer
 
Offers you
response on Email, telephone calls or fax in-time
supply the quotation and mould designs in-time
communication on the technical points in-time
sending pictures for the mould machining progress and mould finishing schedule in-time
mould test and sample delivery in-time