Product Main

Specifications

name  plastic stool moulding solution
mould material 718 2738 P20 S136 etc
cavity 1 cavity
runner cold  runner
mould design 3D/2D
design days 3-5 days
mould life 500,000~1million shots
plastic material PP
injection system direct gate
payment 40% of deposit by L/C T/T 60% of balance by L/C T/T
delivery time 50-60 days
specification depends on customers' demand
 
 
Procedure of mould making
Step 1
place the order & receive the down payment
Step 2
Design and make the drawing( products& moulds)
Step 3
Customer check & confirm
Step 4
Steel material purchase
Step 5
Machine process(CNC, sparking machine, boring machine) & mould makers install
Step 6
Mould testing
Step 7
Send the samples to check
Step 8
Receive the balance & mould shipment