Product Main

Specifications

Delivery time: From 7-20 days from receiving of deposit and confirmation of final part drawing 
OEM for: Honda,VW, BYD, FOXCONN, TYCO, HASCO etc.
Certificate: ISO 9001:2000, material certificate, heat treatment certificate etc.
Heat treatment: Normally, 58-62HRC by vacuum.
Surface treatment: Blacking, vacuum heat treatment, electric plating etc.
Steel material: 1.2379, 1.2343, STAVAX, CuBe etc.