AAC Production Line/Autoclaved Aerated Concrete Production Line
We are the top leader in China on manufacturing the Autoclaved Aerated Concrete Line(AAC) with 65% market share. We have exported our lines to different countries -- Russia, Tailand, Ukraine, Middle East and so on.
We can supply our customer for designning, production, installation, commissioning, trainning and good after-sale service.
Capacity: From 25000 cubic meter to 300, 000 cubic meters per year.
Euipements: Stocking raw materials, mixing, molding, forming, cutting, evaporating and curing, crane cramp, transporting etc.,
1. Product weight is according to 600kg/m3 to control.
2. Annual capacity 200, 000M3.
3. Set raw material proportion: Cement 6.5%, raw lime 23%, flash 68%, gypsum 3%, aluminum paste powder 350G/M3.
4. Water and material rate 0.631
5. One mould product 2.88M3
6. Casting slurry cycle time 5-6 minutes, cut cycle time 5 minutes.
7. Casting slurry temperature 38-42 degree
8. Body quiet stop. Time is 1.5-2.5housr, temperature 50-90 degree, after quiet stop body strength is 0.15-0.18Mpa
9. Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 6 hours/1.6Mpa, total 6.5 hours.
We are the top leader in China on manufacturing the Autoclaved Aerated Concrete Line(AAC) with 65% market share. We have exported our lines to different countries -- Russia, Tailand, Ukraine, Middle East and so on.
We can supply our customer for designning, production, installation, commissioning, trainning and good after-sale service.
Capacity: From 25000 cubic meter to 300, 000 cubic meters per year.
Euipements: Stocking raw materials, mixing, molding, forming, cutting, evaporating and curing, crane cramp, transporting etc.,
1. Product weight is according to 600kg/m3 to control.
2. Annual capacity 200, 000M3.
3. Set raw material proportion: Cement 6.5%, raw lime 23%, flash 68%, gypsum 3%, aluminum paste powder 350G/M3.
4. Water and material rate 0.631
5. One mould product 2.88M3
6. Casting slurry cycle time 5-6 minutes, cut cycle time 5 minutes.
7. Casting slurry temperature 38-42 degree
8. Body quiet stop. Time is 1.5-2.5housr, temperature 50-90 degree, after quiet stop body strength is 0.15-0.18Mpa
9. Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 6 hours/1.6Mpa, total 6.5 hours.