Features of lifting bridge crane
1. Cap:1-30t
2. Span:7.5m-31.5m
3. Power source:3p,380v,50Hz(adjustable)
4. Lifting height:6-30m
5. Working duty:A3-A5
6.Operating Environment: -25~40 degrees
7.Operation method:Pendent line with press button/remote/cabin control
These cranes are equipped with electric hoist and widely used in workshop, warehouse, and material stores and so on. Our factory is specialized in manufactory crane of this series.
A Bridge Crane system consists of three major components.
1 the Bridge Crane, which traverses across the runway
2 the hoist & trolley, which traverses across the bridge and lifts up and down
3 the runway, which is tied to the building structure
Safety guarantee:
1.All the cranes are equipped with overload protection device, Top quality long time bearing polyurethane materials buffer, Crane traveling limit switch, Voltage lower protection function, Emergency stop system and so on.
2.All operations are controlled by central control system.
Design and construction rules:
All the standards which is required for the crane is the Chinese standard
Other notes
| lifting capacity(t) | 16 | |||
| span(m) | 7.5-31.5 | |||
| lifting height(m) | 12-30 | |||
| operational method | ground controlling | |||
| crane traveling mechanism | working speed | 20 | ||
| speed ratio | 58.78 | |||
| motor | type | ZDY22-4/1.5*2 | ||
| rotation speed | 1380r/min | |||
| electric hoist traveling mechanism | electric hoist type | MD | ||
| lifting speed | 3.5 3.5/0.35 | |||
| travelling speed | 20 30 | |||
| motor | cone squirrel cage model | |||
| work duty | A3-A5 | |||
| power source | 3-p 380V 50Hz | |||
| wheel diameter | 370mm | |||
| width of trail | 37-70 | |||
Other notes
| Minimum Order Quantity: | one set or Negotiable |
| Port: | Qingdao/Tianjin port,China |
| Packaging Details: | Wooden crates |
| Delivery Time: | Shipping within 30 days after your 30% advanced payment |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 5000 sets per Month |
| Warranty: | 12 months |
| After sales service: | could send professional engineers to guide technical installation |

