Product Main

Specifications

High strength mining grid,mine grid,mining geogrid
1.large square,high tensile strength 600-400kN/m
2.simple and convenient construction
3.fire-resistant,antistatic
4.mine grid
 
mine grid 600-400kN/m for long-wall recovery system roof support,hock mining geogrid
Mine Grid Introduction:
Geogrid is knitted by polymer yarns with high strength, high modulus and low creep and coated with advanced technology. It is specially used as the substitute of metallic mesh for longwall face recovery and you do not need to weave the mesh frequently on site before the longwall stops.
Polyester mesh is going to be lift at the position 15-25 meters away from the stopping line with winches and fixed pulley at one time. Mesh laying, lifting and advance is circulated with the share pass. Mesh application affords the technical innovation meaning to improve the longwall face recovery efficiency and security. 
polyester mesh is 3-6 m wide and 50-200 m long with tensile strength ranging from 100kn/m-800kn/m. Mesh with strength 800-1000kn/m for special projects can also be supplied. We will manufacture mesh based on the parameters of longwall faces.
 
Mine Grid Application Scopes:
Longwall face recovery for roof support
On both ends of longwall face for roof support
Ultra-high drainage tunnel and old tunnel for roof support
Gangue blocking,buffering and protection of the declining longwall faces
Buffering and protection of the blast area
Slice mining longwall faces
Declining longwall faces for roof support
 
Mine Grid Characteristics:
Large square, flexible and light, strong tensile strength
Simple and convenient construction
Fire-resistant and antistatic
Avoid frequent mesh transportation and weaving
High safty and low labour
Flexible production with different strength and specifications 

We are able to produce mesh with different types and specifiactions according to the requirements of projects.

The data hereinbefore was derived from the experiments in the lab. They may change along with the application spots.
Mine Grid Functions and effects:
1.Laying finished at one time is able to avoid the phenomenon that workers transport and enter the downspoutings to connect the mesh frequently, reduce the labour intensity and improve the secure condition. 
2. After laying on the working face at one time, it is needless to connect the mesh during working, therefore, connecting time is saved and the production efficiency is improved. 
3. The flexible mesh is integral after laying, the overframe and backward movement is fast and effective. In comparison with the metal mesh, the laying is partially slow. 
4.Mesh laying can be carried out together with the coal-splitting, pushing and support advance, therefore, the working speed steps up. 
5.Fast laying almost has no impact on the shocks advancing speed and reduces the advanced influence of working faces on the coal wall. 
6. Increase the speed of terminal mining on the working surface which is sensible to self-ignite easily and reduce the self-ignition risks.