Product Main

Specifications

Place of Origin Shandong, China (Mainland)
Brand Name Magrotek
Model Number Dock
Part Dock
Name floating dock
another name floating marina
materials steel, aluminium
finish HDG, powder coated  

Minimum Order Quantity: 10 Piece/PiecesTrial Order
 
Port: Qingdao
Packaging Details: nude packing
Delivery Time: 30-45 days
Payment Terms: L/C,D/A,D/P,T/T 

Floating dock for maximum corrosion resistance

 
Floating dock, made of full-welded steel,wood or FRP, and process that all steel components hot-dipped galvanizing protected for maximum ccorrosion resistance.
We can build your marina according to your design and requirement as well as supply you with the standard design.