Product Main

Specifications

Detailed Product Description
1 output paper: kraft paper, corrugated paper
2 net paper width: 550mm
3 capacity: 7t/d
4 grammage:120-200g/m2
Structure and characteristic of main part:
1.Cylinder section: Φ1500mm×2300mm stainless steel cylinder mould 2 sets, Φ450mm×2300mm couch roll 2 sets, φ400×2300mm reverse roll 1set, coated by rubber, rubber shore hardness 38°C±2.
2.Press section: Φ500mm×2300mm marble roll 1 set, Φ450mm×2300mm rubber roll 1 set, coated by rubber,rubber shore hardness 90°C±2. Pneumatic compression device, allocating a group of scraper.
3.Dryer section:Φ1500mm×2300mm dryer can 2 sets,Φ500mm×2300mm touch roll 1 set, Φ4500mm×2300mm double-dryer cans fly roll 1 set, allocating two scrapers and setting the dried wire device od double-dryer can. Pneumatic compression device, coated by rubber,rubber shore hardness 90°C±2.
4,winding section: 1880mm cylindrical winding machine 1 set.
5.Drive way: AC inverter speed, section drive.
After sale service:
  1,The company strictly in accordance with the signed device configuration and 
technical requirements ,According to the national industry standard for design 
and manufacturing, and guaranteed to the user's device is compliant qualified products.
  2, After the commencement of the contract, within ten days of the equipment design 
and manufacturing company,Enduser installation process coordination, convergence, 
and inspection;Business contacts on both sides of the letter have to be back within 8 hours.
  3, In accordance with the mutually agreed time and the cycle for equipment installation, 
and commissioning.
  4, Equipment quality and shelf life of one year, the vulnerability is not within the guarantee period.
Package of quality roller shelf life of six months.Refers to all goods shipped to the user The date of 
acceptance for the quality of shelf life.
  5, The quality warranty period, the company free of charge to provide the necessary technical services,
 Occurred as a result of equipment design, manufacturing quality problems lead to equipment, 
the company will Responsible for replacement and maintenance.
  6, After shelf life, the company to provide customers with technical services for life, and long-term To price and quick delivery of spare parts, spare parts.

 I. Lead time : With 60-90 days
 
II.Term of payment : 40%T/T  in advance ,60% T/T before shipment .
 
III.    Shipment : It will be arranged by the seller , the seller will offer sea freight to the buyer two weeks before shipment and the buyer must pay the sea freight to seller by T/T within 3 days after receive such offer on condition they accept it. The seller need to pack all machines well.
 
 
IV. Installation &after sales service . a)   The seller will send 3 engineers to go to the buyer's plant to guide installation work of all supplied machines by the seller. They will also guide test run of the whole plant and sign test run and acceptance agreement after successful test run.