· EPS sandwich panel for roof and wall
· With square tube column inside and can't see any steel outside the house
· Without steel base, prefab house should be built on the concrete foundation and can build the foundation according to the size of the house
· Materials will be loaded by nude packing, it can save you lots of the freight