Mud brick making machine,JK30 brick extruder
Brick extruder description:
1. Structure: all steel structure. it is made by high quality steel plate welding;
2. Suitable range: the small brickyard or the area which is lack of electric power;
3. Extrusion pressure: 2.0MPa, it can make both solid and hollow brick;
4. Control: adopts pneumatic clutch;high sensitivity and automatic.
5. Bearing: it is provided by Luoyang bearing group,one of famous bearing factory.
6. Main axle: Quenching, tempering, the suppression experiment, so strengthen main axle's steel and toughness.
7. Rack: whole welding and overall plane processing, these can make better for the machines' concentrically.
8. Techniques of squeeze out cylinder: the whole processing, quenching processing, these can increase the toughness and extent complete machine life.
9. Vacuum chamber: adopts the funnel shape, it can pull out the vacuum fatly.
10. Reamer: adopts the high chromium casting, quenching processing, the service life reaches (8,000,000-10,000,000 standard bricks), it is better than the ordinary spray coating craft.
Technical parameters:
Item
|
Units of measurement
|
JK30/30-2.0
|
Production capacity
|
Blocks/hour
Standard brick
|
4000-6000
|
Diameter of reamer
|
mm
|
300
|
Maximum extrusion pressure
|
MPa
|
2.0
|
Vacuum degree
|
MPa
|
-0.092
|
Power
|
KW
|
55
|
Formation moisture content
|
%
|
18-22
|
Spindle speed
|
r/min
|
51
|
Service policy:
Before sale
1. Help customers to confirm the reasonable machine based on demand.
2. To design and produce machines according to the special demands of customers.
In sale:
1. Based on customer's demand to offer reasonable quotation project.
2. Welcome customer to visit factory and kiln site.
After sale:
1. Our company is responsible for production line design, installation, debugging and worker training.
2. Our company is responsible for supply technical instruction for the foundation, kiln building etc.
3. Our company provides technical support and after-sales service at the most speedy manner.
4. During the period of installation, our technicians will be responsible for training the factory worker for machine maintenance, operation skill.