100watt led outside floodlight CE RoHS
- product details / Key Specifications
- Product Name: 100watt led
- LED Luminaire: Efficiency 100-110 lm/w
- Lamp Luminaire: Efficiency 75 lm/w
- Lamp Luminous Flux: 8463-8887lumens
- Colour Rendering Index: 70-75 Ra
- CCT / Warm White: 3000K (3045 ±145K)
- CCT / Natural White: 4000K (39856 ±275K)
- CCT / Day White: 5000K (5028 ±283K)
- CCT / Cool White: 6500K (6530 ±510K)
- Emission Distance: 8 meters
- Illuminance Uniformity: >0.4
- Tatal Harmonic Distortion: ≤9 percent
- Surface Temperature: +41.3 to + 44.2 degree C
- Working Temperature: -20 to +50 degree C
- Storage Temperature: -25 to +50 degree C
- Junction Temperature: ≤80 degree C
- Power Supply: Internal Constant Current
- Power Manufactory: SENGBA
Primary Competitive Advantages and Product Features
Light Sources | Adopts America bridgelux 45mil size chip to makes integrated COB LEDs |
Lamp Boby | High-purity aluminum 6020 and through the metal oxide surface treatment or heat-curing coating |
Optical Lens | Glass Cover |
Power Supply | Adopts Meanwell or Moso famous brand and ensures long time to operation and least 3 years warranty |
Heat Dissipation | Adopts 6020 types of new-tech heat materials, which uses goodness aluminum-alloy, high thermal conductivity to ensure best heat dissipation |
Energy Saving | Low energy consumption and high brightness |
Luminaire Efficiency | High-efficiency low power consumption (80lm/w) |
Mechanical Behavior | No speckle, flickering, humming and buzzing, No delay start. It can reach its normal light as soon as it is turned on, avoiding the long-time start process of the traditional light |
Antijamming Capability | No adverse glare or flicker, which eliminates vision fatigue and distraction for good light distribution |
Environmental Protection | Eco-friendly, no UV and infrared radiation, no risk of mercury emission, no environmental pollution. |
Packing | Professional packaging and used Eco-Friendly Material |
Using | Easy to install and no maintenance cost |
Application | Workshops, factories, storehouses, toll stations, gas stations, supermarkets, exhibition halls, gymnasiums |
Trade Terms
- T/T(30% T/T in advance, the balance bo be paid before shipment.), PayPal, Western Union or L/C
- Minimum Order:1pcs
- Samples can be available within 6 working days
- Lead time:15 working days for 100 to 500pcs, 20 working days for 500 to 2000pcs
- Shipping freight is quoted under your requests
- Shipping port:Shenzhen YICT/SKO/Air port or Hong Kong HIT/Air port
- Discounts are offered based on order quantities
- Packaging: Neutral package, otherwise, can be customized according to customer requirements of Logo, Brand and etc
-
OEM design and R & D production is avaliable