Weight/m2 (g/m2)
|
400
|
500
|
600
|
700
|
800
|
900
|
1000
|
|
PE Thickness (mm)
|
0.25-0.35
|
0.30-0.60
|
||||||
Break strength (KN/m)
|
5.0
|
7.5
|
10.0
|
12.0
|
14.0
|
16.0
|
18.0
|
|
Break Elongation %
|
30-100
|
|||||||
CBR (KN)
|
1.1
|
1.5
|
1.9
|
2.2
|
2.5
|
2.8
|
3.0
|
|
tear strength (KN)
|
0.15
|
0.25
|
0.32
|
0.40
|
0.48
|
0.56
|
0.62
|
|
peel strength (N/cm)
|
6
|
6
|
||||||
Vertical Permeability Coefficient cm/s
|
10-12
|
|||||||
Hydrostatic pressve (Mpa)
|
0.4-0.6
|
0.6-1.0
|
Model NO.:
|
Width: 2-7m; Weight: 300-2,600g/m2
|
Packing:
|
Wove Fabric in Rolls Ao at The Client′s Request
|
Type:
|
Waterproof Roll Material
|
Material:
|
HDPE
|
One-Cloth One-Film:
|
Base Cloth: 100-1, 000G/M2 Film Thickness: 0.2-2.0m
|
Two-Cloth One-Film:
|
Base Cloth: 80-600G/M2 Film Thickness: 0.2-2.0mm.
|
One-Cloth Two-Film:
|
Base Cloth: 100-1, 000G/M2 Film Thickness: 0.2-0.8m
|
Multi-Cloth Multi-Film:
|
Base Cloth: 100-1, 000G/M2 Film Thickness: 0.2-0.8m
|
1. One piece of geotextile and one piece of membrane; Weight of base geotextile: 100-1000G/M² ; Thickness of geomembrane: 0.1-1.5mm.
2. Two pieces of geotextiles and one piece of membrane; Weight of base geotextile: 80-600G/M2; Thickness of geomembrane: 0.2-1.5mm.
3. One piece of geotextile and two pieces of membranes. Weight of base geotextile: 100-1000G/M² ; Thickness of geomembrane: 0.1-0.8mm.
2. Two pieces of geotextiles and one piece of membrane; Weight of base geotextile: 80-600G/M2; Thickness of geomembrane: 0.2-1.5mm.
3. One piece of geotextile and two pieces of membranes. Weight of base geotextile: 100-1000G/M² ; Thickness of geomembrane: 0.1-0.8mm.
use:
1, River dike, lake bank, tailing bank, reservoir area, water channel and liquid tank (pit).
2. Anti-seepage blocking of subway, basement and tunnel.
3. Waterlogging and anti-seepage of roadbed and other foundation.
4. Horizontal anti-seepage laying of dike and bank, vertical anti-seepage layer of foundation, construction cofferdam and waste material yard
5. Seawater and freshwater cultivation farm.
2. Anti-seepage blocking of subway, basement and tunnel.
3. Waterlogging and anti-seepage of roadbed and other foundation.
4. Horizontal anti-seepage laying of dike and bank, vertical anti-seepage layer of foundation, construction cofferdam and waste material yard
5. Seawater and freshwater cultivation farm.