Block Making Machine NF8-15: good performance, and passed ISO9001: 2000 certification
Plant Construction Program
|
||
Mixer operator
|
Workshop space
|
About300㎡
|
Stacking space
|
About2000-2500㎡
|
|
Raw material storage space
|
About600㎡
|
|
Office space
|
About100㎡
|
|
Working Capital space
|
About1000㎡
|
|
Free space
|
About800㎡
|
|
Remark:Detail arrangement according to actual situation
|
||
(Power) Distribution
|
100KW
|
|
Voltage
|
380V
|
|
Water
|
15-25CBM/DAY
|
|
Staff
|
Factory director
|
1
|
Financial officers
|
1
|
|
Porter
|
1
|
|
Host operator
|
1
|
|
Transport workers
|
2
|
|
Palletizing staff
|
5--6
|
|
Mixer operator
|
1
|
|
Product Maintenance
|
1
|
|
Other staff needed as your demand
|
||
Cost and benefit analysis
|
||
1.Regions of different materials prices, costs vary
|
||
2.Availability of raw materials:Slag, Construction Waste, Fly Ash, River sand, Coal Gangue,etc.
|
||
3.Reference to local market conditions
|
Particular vibration type: The computer controls the pressure and following rate of hydraulic system; vertival synchro-vibration; frequency conversion; brake. Transforming the over quantity of hydraulic oil to a vibrating activated force, thereby basically eliminating the energy waste.
Reasonable distributing of vibration: mold box is fixed at the vibrating table via the cylinder of drawing mold, there is a special vibrator fitted on the pressure head. The combine vibration of the work table and mold increases the vibrating velocity and causes the concrete liquefy and exhaust quickly, final the product reaches the high density and high strength.