) Design 3D drawing for customers confirmation according to their 2d drawing , 3d drawing or samples when placing to order.
2) Mould Matieral: High grade steel from Japan Germany and imported P20 and 2316. 1.2343 1.2767. steel ETC.
3) Technology: Advanced second-level taper positioning technology and slide-type independent self-locking. hence the concentricity of the product is guaranteed.
4) independent temperature contorl . heating system. which boasts an even heating temperature and keeps product with reliable and stable quality.Machining contorl. EDM contorl and CNC contorl process.
5) Cavity and mold: independent condensation.
6) Product matieral:PE/PP/PVC/ABS/ASA/PC+ABS/PA6+GF/PA66..Ect.
7) Lead time: 20-40 days after receipt of deposit and confirmation of drawings, mainly depending on the mould demensions and structure.
8) Payment: 5/3/2(50% deposit, 30% after receipt of the first sample, the balance 20% before shipment after confirmation OK )by T/T
9) Packing: Standard wooden case or as per customers’ requirements.
10) According to customers’ requirements making the spare part.