NO.
|
Name
|
Item description
|
The main equipment configuration situation
|
Quantity
|
1
|
Inlet gas
regulating and meter system
|
Filtration, separation and measurement of raw material gas
|
Valve, accessories, meter(Φ273)ect.
|
2 SETS
|
2
|
Desulfurization and
dehydration tower
|
Desulfurization and purification of raw material gas
|
Desulfurization tower (PN1.0 DN1600)
|
2 PCS
|
3
|
Compress system
|
D compressor D-5.0/5-250 type
The volume of the exhaust: 1600Nm3/h(Design point: 0.5 Mpa)
Motor Power: 315KW
|
1)Compressor host, oil-water separator, one-way check valve, drain valve, Safety valve, explosion-proof motor, lubricating oil pump oiler, random special tools, parts and components, and random technical information
|
8 PCS
|
2)Skid-mounted base
|
8 PCS
|
|||
3)Cooling system: efficient water cooler
|
8 SETS
|
|||
4)Automatic PLC control cabinet: soft-start +automatically start and stop
|
8 PCS
|
|||
4
|
Gas storage
|
|
|
8 SETS
|
5
|
Dispenser or trailer
|
|
|
8 SETS
|